Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

Air Quality

15/08/2023

The faded NRMM label on the excavator located in Portion 2 should be replaced.

Improvement/Rectification was observed during follow-up audit session on 23 Aug 2023.

Contract No.: ND/2019/02

Water Quality

28/07/2023

The exposed slopes next to Sheung Yue River should be covered by tarpaulin sheets and maintained regularly and properly to prevent muddy water discharge during rainstorm.

Improvement/Rectification was observed during follow-up audit session on 2 Aug 2023.

25/08/2023

Exposed slope surfaces should be covered by tarpaulin sheets properly. / Exposed slope surfaces along the riverside should be covered by tarpaulin sheets securely and properly as soon as possible before raining/typhoon.

Item remarked as 230830-R03. Follow-up action is needed to be review.

30/08/2023

Follow-up action is needed to be reported in the following month.

Air Quality

28/07/2023

Faded NRMM label should be replaced.

Improvement/Rectification was observed during follow-up audit session on 2 Aug 2023.

Landscape and Visual

28/07/2023

The removed green hoarding along Sheung Yue River due to the construction works should be replaced and maintained properly as soon as possible.

Item remarked as 230802-R01. Follow-up action is needed to be review.

02/08/2023

Item remarked as 230809-R01. Follow-up action is needed to be review.

09/08/2023

Item remarked as 230816-R01. Follow-up action is needed to be review.

16/08/2023

Item remarked as 230825-R01. Follow-up action is needed to be review.

25/08/2023

Item remarked as 230830-R01. Follow-up action is needed to be review.

30/08/2023

Follow-up action is needed to be reported in the following month.

16/08/2023

Tree protection zone should be maintained properly and regularly.

Item remarked as 230825-R02. Follow-up action is needed to be review.

25/08/2023

Item remarked as 230830-R02. Follow-up action is needed to be review.

30/08/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

28/07/2023

Dusty stockpiles should be covered with tarpaulin sheets.

Item remarked as 230804-R01. Follow-up action is needed to be review.

04/08/2023

Item remarked as 230811-R01. Follow-up action is needed to be review.

11/08/2023

Item remarked as 230815-R01. Follow-up action is needed to be review.

15/08/2023

Item remarked as 230825-R01. Follow-up action is needed to be review.

25/08/2023

Item remarked as 230831-R01. Follow-up action is needed to be review.

31/08/2023

Follow-up action is needed to be reported in the following month.

Water Quality

28/07/2023

Provide adequate wheel-washing facilities for each vehicle exits.

Item remarked as 230804-O01. Follow-up action is needed to be review.

04/08/2023

Item remarked as 230811-O01. Follow-up action is needed to be review.

11/08/2023

Item remarked as 230815-O01. Follow-up action is needed to be review.

15/08/2023

Item remarked as 230825-O01. Follow-up action is needed to be review.

25/08/2023

Item remarked as 230831-O01. Follow-up action is needed to be review.

31/08/2023

Follow-up action is needed to be reported in the following month.

28/07/2023

Provide sand bags to prevent muddy water discharge.

Item remarked as 230804-R02. Follow-up action is needed to be review.

04/08/2023

Item remarked as 230811-R02. Follow-up action is needed to be review.

11/08/2023

Item remarked as 230815-R02. Follow-up action is needed to be review.

15/08/2023

Item remarked as 230825-R02. Follow-up action is needed to be review.

25/08/2023

Item remarked as 230831-R02. Follow-up action is needed to be review.

31/08/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Water Quality

10/08/2023

All vehicles should be cleaned of earth, mud and debris before leaving the site.

Item remarked as 230816-R01. Follow-up action is needed to be review.

16/08/2023

Item remarked as 230824-R01. Follow-up action is needed to be review.

24/08/2023

Item remarked as 230831-R01. Follow-up action is needed to be review.

31/08/2023

Follow-up action is needed to be reported in the following month.

31/08/2023

Stockpile of dusty materials should be covered properly and securely during rainstorm.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Water Quality

21/08/2023

The design of the on-site drainage should be enhanced to prevent runoff going through site surface at On Lok Garden.

Item remarked as 230828-O01. Follow-up action is needed to be review.

28/08/2023

Follow-up action is needed to be reported in the following month.

28/08/2023

Temporary ditches should be provided for vehicle washing spaces to avoid wastewater discharge into inappropriate watercourse.

Follow-up action is needed to be reported in the following month.

28/08/2023

Blue hose attached to water pump should be kept away from the riverside.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--