11.1 Seven
(7) Limit Level for DO, One (1) Action Level and Four
(4) Limit Level for turbidity, and Three (3) Limit Level for Suspended Solid of
impact water quality monitoring were recorded. After investigation,
the exceedance was considered due to the other external factors rather than the
contract works.
11.2 No Action/Limit Level exceedance for air
quality, construction noise, ambient arsenic, built heraitage
and landfill gas monitoring was recorded in the reporting month. The summary of
exceedance record in the reporting month is shown in Appendix O.
11.3 Ecological monitoring was carried out in the reporting
month. The results will be compared with Action and Limit Levels after issuance
of the Final Baseline Ecological Report.
11.4 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.5 No environmental non-compliance was recorded in the
reporting month.
11.6 Two environmental complaints were received in
the reporting month. The two complaints regarding the same muddy water
discharge situation near Castle Peak Road, Kwu Tung
near the site area of ND/2019/05, were received and referred by EPD on 3 Apr
2023. The Cumulative Complaint Log since the commencement of the Project is
presented in Appendix S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.