13.1
This monthly EM&A Report
presents the EM&A work undertaken in September
2022
in accordance with the Updated EM&A Manual.
13.2 Two (2)
Limit Level for DO, One (1) Action Level for Arsenic, One (1) Action Level and One
(1) Limit Level for Suspended Solids, One (1) Action Level and Three (3) Limit
Level for Turbidity of impact water quality monitoring exceedance
were
recorded. One (1) Action Level of construction noise was recorded.
13.3 No Action/Limit Level exceedance for air quality, ambient arsenic,
landfill gas monitoring and build heritage monitoring was recorded in the
reporting month.
Contract No.
ND/2019/01
13.4
Environmental
site inspection were conducted on 6, 13, 20 and 29 Sep 22 by ET in the reporting month.
Contract No. ND/2019/02
13.5
Environmental
site inspection were conducted on 7, 14, 21 and 28 Sep 22 by ET in the reporting month.
Contract No.
ND/2019/03
13.6
Environmental
site inspection were conducted on 2, 9, 16, 20 and 30 Sep 22 by ET in the reporting month.
Contract No.
ND/2019/04
13.7
Environmental
site inspection were conducted on 1, 8, 16, 22 and 27 Sep 22 by ET in the reporting month.
Contract No.
ND/2019/05
13.8
Environmental
site inspections were conducted on 5, 15, 19 and 26 Sep 22 by ET in the reporting month.
Contract No.
ND/2019/06
13.9
Environmental
site inspections were conducted on 1, 8, 16, 22 and 27 Sep 22 by ET in the reporting month.
Contract No.
ND/2019/07
13.10
Environmental
site inspections were conducted on 9, 15, 23 and 30 Sep 22 by ET in the reporting month.
13.11
Two
environmental complaints were received in the reporting month. No notification of summons or
successful prosecutions was received in the reporting month.
13.12
The
ET would keep track on the EM&A programme to ensure compliance of
environmental requirements and the proper implementation of all necessary
mitigation measures.
13.13 According to the
environmental audits performed in the reporting month, the following
recommendations were made:
Air
Quality Impact
¡P To regular water haul roads;
¡P To provide vehicle washing
facilities with high pressure water jet at every discernible or designated
vehicle exit point;
¡P To maintain the impervious
material to entirely cover the stockpile of dusty materials; and
¡P To ensure all regulated
machines displayed with valid Non-road Mobile Machinery (NRMM) labels.
Construction
Noise Impact
¡P To ensure compressor operated
with doors closed.
Water
Impact
¡P To review and implement temporary
drainage system;
¡P To prevent any surface runoff
discharge into Sheung Yuen River, Ma Wat River or public road;
¡P To provide sandbags or
construct berm to prevent any outflow of muddy water from site area;
¡P To ensure all vehicle clear of earth
and mud before leaving the site areas;
¡P To ensure the drainage
facilities would not be clogged with waste or sediment to avoid overflow;
¡P To regularly check the
condition of desilting materials for proper function;
¡P To regularly maintain and ensure
water treatment facilities proper operation and function;
¡P To divert all the water
generated from the construction site to
de-silting facilities with sufficient handling capacity before discharge; and
¡P To avoid or regularly clear the stagnant water in
drip trays;
Waste/Chemical
Management
¡P To dispose of general refuse
properly;
¡P To clear and avoid oil stains at site areas;
¡P To provide proper storage
areas for chemical; and
¡P To maintain drip trays for chemical storage well.
Landfill
Gas Hazard
¡P ¡§No
Smoking¡¨
and ¡§No
Naked Flame¡¨
notices in Chinese and English should be posted prominently around the
construction site.
Land
Contamination
¡P Stockpiling
site(s) should be lined with impermeable sheeting and bunded. Stockpiles should
be properly covered by impermeable sheeting to reduce dust emission during dry
season or contaminated run-off during rainy season. Watering should be avoided
on stockpiles of soil to minimise runoff.
Ecology
¡P Properly erect and maintain
2m high solid barriers for protecting Siu Hang San Tsuen Stream.
Permit/
Licences
¡P To display valid Permit or
Licences at the site entrances.