11.1 Two (2)
Limit Level for DO, One (1) Action Level for Arsenic, One (1) Action Level and One
(1) Limit Level for Suspended Solids, One (1) Action Level and Three (3) Limit
Level for Turbidity of impact water quality monitoring were recorded. After
investigation, all exceedances were considered due to the other external
factors rather than the contract works.
11.2 One (1)
Action Level for construction noise was recorded as one complaint about
construction noise was received during the reporting month. No
Action/Limit Level exceedance for air quality, ambient arsenic, landfill gas monitoring
and build heritage monitoring was recorded in the reporting month. The summary
of exceedance recorded in the reporting
month is shown in Appendix O.
11.3 Ecological monitoring was carried out in the reporting
month. The results will be compared with Action and Limit Levels after issuance
of the Final Baseline Ecological Report.
11.4 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried out.
11.5 No environmental non-compliance was recorded in the
reporting month.
11.6 Two
environmental complaints were received in the reporting month. One for
ND/2019/01 and ND/2019/05, and One for ND/2019/02. The Cumulative Complaint Log since the commencement of the Project is
presented in Appendix S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.