Table 10.2
Observations and Recommendations during Site Audits
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Contract No.: ND/2019/01 |
|||
Waste / Chemical Management |
20/09/2022 |
General refuse should be disposed of regularly and
properly. |
Improvement/Rectification was
observed during follow-up audit session on 29 September 2022. |
Contract No.: ND/2019/02 |
|||
Waste / Chemical Management |
21/09/2022 |
Drip trays should be provided for chemical
storages. |
Item Remarked as 220928-R01. Follow-up action is
needed to be review. |
28/09/2022 |
Drip trays should be provided for chemical containers. |
Follow-up action is needed to be reported in the
following month. |
|
Air Quality |
31/08/2022 |
Dusty material should be removed or covered entirely. |
Improvement/Rectification
was observed during follow-up audit session on 7 September 2022. |
Water Quality |
21/09/2022 |
To enhance and properly maintain existing water mitigation measures
at site boundaries and next to Sheung Yue River to
prevent muddy runoff from going out of site boundaries or into the river. |
Item Remarked as 220928-R02. Follow-up action is
needed to be review. |
28/09/2022 |
Follow-up action is needed to be reported in the
following month. |
||
Contract No.: ND/2019/03 |
|||
Air Quality |
26/08/2022 |
Dusty
debris were observed at the site exit of Yin Kong. Contractor was reminded to
clear the dusty debris immediately. |
Improvement/Rectification was
observed during follow-up audit session on 2 September 2022. |
02/09/2022 |
Improvement/Rectification was
observed during follow-up audit session on 9 September 2022. |
||
09/09/2022 |
Improvement/Rectification was
observed during follow-up audit session on 16 September 2022. |
||
20/09/2022 |
Item
Remarked as 220930-O01. Follow-up action is needed to be review. |
||
30/09/2022 |
Follow-up
action is needed to be reported in the following month. |
||
09/09/2022 |
NRMM labels
should be displayed properly on excavators. |
Item
Remarked as 220916-R01. Follow-up action is needed to be review. |
|
16/09/2022 |
Faded
NRMM labels should be replaced. |
Item
Remarked as 220920-R01. Follow-up action is needed to be review. |
|
20/09/2022 |
Improvement/Rectification was
observed during follow-up audit session on 30 September 2022. |
||
Water Quality |
26/08/2022 |
To
clear the wheel-washing bay regularly. |
Item
Remarked as 220902-R01. Follow-up action is needed to be review. |
02/09/2022 |
Item
Remarked as 220909-R01. Follow-up action is needed to be review. |
||
09/09/2022 |
Improvement/Rectification was
observed during follow-up audit session on 16 September 2022. |
||
Waste / Chemical Management |
09/09/2022 |
Drip
tray should be provided for chemical storage. |
Improvement/Rectification was
observed during follow-up audit session on 16 September 2022. |
30/09/2022 |
Oil
leakage was observed at the surrounding of the generator. Contractor was
reminded to clear the leakage immediately. |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/04 |
|||
Water Quality |
24/08/2022 |
Covering of stockpile is required to minimize the
mudding runoff during rainstorm. |
Item Remarked as 220901-R01. Follow-up action is
needed to be review. |
01/09/2022 |
Item Remarked as 220908-R01. Follow-up action is
needed to be review. |
||
08/09/2022 |
Item Remarked as 220916-R01. Follow-up action is
needed to be review. |
||
16/09/2022 |
Item Remarked as 220922-R01. Follow-up action is
needed to be review. |
||
22/09/2022 |
Item Remarked as 220927-R01. Follow-up action is
needed to be review. |
||
27/09/2022 |
Follow-up action is needed to be reported in the
following month. |
||
01/09/2022 |
Muddy surface runoff and not efficient measure
were observed. Efficient measure, e.g. the use of geotextile, should be provided. |
Improvement/Rectification
was observed during follow-up audit session on 8 September 2022. |
|
Ecology |
01/09/2022 |
Not well maintained of silt curtains were
observed. Contractor was reminded to maintain well and properly. |
Improvement/Rectification
was observed during follow-up audit session on 8 September 2022. |
Air Quality |
16/09/2022 |
Exposed worksite should be watered regularly. |
Improvement/Rectification
was observed during follow-up audit session on 22 September 2022. |
Waste / Chemical Management |
22/09/2022 |
To provide drip tray for chemical storage, and
maintain their conditions to ensure proper functioning. |
Improvement/Rectification
was observed during follow-up audit session on 27 September 2022. |
Contract No.: ND/2019/05 |
|||
Water Quality |
29/08/2022 |
Enhance the mitigation measure to avoid muddy
water discharging to public drainage and Ma Wat River. (Portion 9) |
Item Remarked as 220905-R01. Follow-up action is
needed to be review. |
05/09/2022 |
Improvement/Rectification
was observed during follow-up audit session on 15 September 2022. |
||
05/09/2022 |
Maintain the mitigation measure to avoid muddy
water discharging to Ma Wat River. (Portion 1) |
Improvement/Rectification
was observed during follow-up audit session on 15 September 2022. |
|
Air Quality |
19/09/2022 |
Dusty Stockpile should be covered by impervious
sheeting properly. (Kwu Tung) |
Improvement/Rectification
was observed during follow-up audit session on 26 September 2022. |
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |