Table 10.2
Observations and Recommendations during Site Audits
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Contract No.: ND/2019/01 |
|||
- |
- |
- |
- |
Contract No.: ND/2019/02 |
|||
Waste / Chemical Management |
28/09/2022 |
Drip trays should be provided for chemical containers. |
Improvement/Rectification
was observed during follow-up audit session on 5 October 2022. |
12/10/2022 |
To clear the drip tray content. |
Improvement/Rectification
was observed during follow-up audit session on 19 October 2022. |
|
Air Quality |
12/10/2022 |
To ensure vehicles are properly washed, cleaned
of muddy debris before exiting the site. |
Item remarked as 221019-R02. Follow-up action is needed
to be review. |
19/10/2022 |
Improvement/Rectification
was observed during follow-up audit session on 24 October 2022. |
||
12/10/2022 |
To water haul road regularly. |
Improvement/Rectification
was observed during follow-up audit session on 19 October 2022. |
|
Water Quality |
28/09/2022 |
To enhance and properly maintain existing water mitigation measures
at site boundaries and next to Sheung Yue River to prevent muddy runoff from
going out of site boundaries or into the river. |
Item remarked as 221005-R01. Follow-up action is
needed to be review. |
05/10/2022 |
Item remarked as 221012-R01. Follow-up action is
needed to be review. |
||
12/10/2022 |
Item remarked as 221019-R01. Follow-up action is
needed to be review. |
||
19/10/2022 |
Item remarked as 221024-R02. Follow-up action is
needed to be review. |
||
24/10/2022 |
To enhance and properly maintain existing water mitigation measures
at site boundaries. |
Follow-up action is needed to be reported in the
following month. |
|
24/10/2022 |
To enhance mitigation measures to prevent water quality impact to the
River Beas. |
Follow-up action is needed to be reported in the
following month. |
|
Contract No.: ND/2019/03 |
|||
Air Quality |
30/09/2022 |
Dusty
debris were observed at the site exit of Yin Kong. Contractor was reminded to
clear the dusty debris immediately. |
Item
remarked as 221007-O01. Follow-up action is needed to be review. |
07/10/2022 |
Item
remarked as 221014-O01. Follow-up action is needed to be review. |
||
14/10/2022 |
Item
remarked as 221018-O01. Follow-up action is needed to be review. |
||
18/10/2022 |
Item
remarked as 221028-O01. Follow-up action is needed to be review. |
||
28/10/2022 |
Follow-up
action is needed to be reported in the following month. |
||
28/10/2022 |
Absence
of NRMM label from a regulated machine. |
Follow-up
action is needed to be reported in the following month. |
|
Water Quality |
18/10/2022 |
Vehicles
were observed leaving site not fully cleaned of muddy debris. Contractor was reminded
to properly clean the vehicles leaving site with high pressure jets. |
Improvement/Rectification was
observed during follow-up audit session on 28 October 2022. |
Waste / Chemical Management |
30/09/2022 |
Oil
leakage was observed at the surrounding of the generator. Contractor was
reminded to clear the leakage immediately. |
Improvement/Rectification was
observed during follow-up audit session on 7 October 2022. |
Contract No.: ND/2019/04 |
|||
Water Quality |
27/09/2022 |
Covering of stockpile is required to minimize the
muddy runoff during rainstorm. |
Item Remarked as 221006-R01. Follow-up action is
needed to be review. |
06/10/2022 |
Item Remarked as 221013-R01. Follow-up action is
needed to be review. |
||
13/10/2022 |
Item Remarked as 221019-R01. Follow-up action is
needed to be review. |
||
19/10/2022 |
Item Remarked as 221027-R01. Follow-up action is
needed to be review. |
||
27/10/2022 |
Follow-up action is needed to be reported in the
following month. |
||
13/10/2022 |
Muddy water discharge was observed due to not
well maintenance of sedimentation tank. Sedimentation tank should maintain
properly in daily. |
Improvement/Rectification
was observed during follow-up audit session on 19 October 2022. |
|
19/10/2022 |
Muddy water discharge was observed. Mitigation
measure should enhance or maintain the sedimentation tank properly in daily. |
Improvement/Rectification
was observed during follow-up audit session on 27 October 2022. |
|
Waste / Chemical Management |
13/10/2022 |
Drip tray should be provided for chemical/fuel
containers. |
Item Remarked as 221019-R02. Follow-up action is
needed to be review. |
19/10/2022 |
Improvement/Rectification
was observed during follow-up audit session on 27 October 2022. |
||
Contract No.: ND/2019/05 |
|||
Air Quality |
17/10/2022 |
Broken NRMM label should be replaced. |
Improvement/Rectification
was observed during follow-up audit session on 24 October 2022. |
24/10/2022 |
Dusty debris was observed at the exit of portion
18. Contractor was reminded to clean immediately. |
Improvement/Rectification
was observed during follow-up audit session on 31 October 2022. |
|
Water Quality |
24/10/2022 |
Muddy water was discharged into public drainage. Should
enhance the mitigation measure. |
Improvement/Rectification
was observed during follow-up audit session on 31 October 2022. |
31/10/2022 |
Enhance the water mitigation measure in portion
18. |
Follow-up action is needed to be reported in the
following month. |
|
Waste / Chemical Management |
17/10/2022 |
Drip tray should be provided for Fuel/Chemical containers. |
Improvement/Rectification
was observed during follow-up audit session on 24 October 2022. |
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
Waste / Chemical Management |
28/10/2022 |
Drip tray should be provided for chemical /fuel containers. |
Follow-up action is needed to be reported in the
following month. |