Table II      Summary Table for EM&A Activities in the Reporting Month

EM&A Activities

Monitoring Station (s)

Works Contracts

ND/2019/01

ND/2019/02

ND/2019/03

ND/2019/04

ND/2019/05

ND/2019/06

ND/2019/07

1-hr Total Suspended Particulates (TSP) Monitoring

FLN-DMS1

N/A

N/A

5, 11, 17, 23 and 27 May 22

5, 11, 17, 23 and 27 May 22

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

5, 11, 17, 23 and 27 May 22

FLN-DMS5

4, 10, 16, 20 and 26 May 22

4, 10, 16, 20 and 26 May 22

N/A

KTN-DMS4

4, 10, 16, 20 and 26 May 22

4, 10, 16, 20 and 26 May 22

N/A

24-hr TSP Monitoring

FLN-DMS1

N/A

N/A

4, 10, 16, 20 and 26 May 22

4, 10, 16, 20 and 26 May 22

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

4, 10, 16, 20 and 26 May 22

FLN-DMS5A

4, 10, 16, 20 and 26 May 22

4, 10, 16, 20 and 26 May 22

N/A

KTN-DMS4

4, 10, 16, 20 and 26 May 22

4, 10, 16, 20 and 26 May 22

N/A

Noise Monitoring

CP-FLN-NMS1

N/A

5, 11, 17 and 27 May 22

N/A

CP-FLN-NMS2

N/A

5, 11, 17 and 27 May 22

N/A

CP-KTN-NMS2

4, 10, 20 and 26 May 22

N/A

N/A

CP-KTN-NMS3

CP-KTN-NMS5

CP-KTN-NMS6

N/A

4, 10, 20 and 26 May 22

Ecological Survey

Monitoring of Measures to Minimise Disturbance to Water Birds on Ng Tung River, Sheung Yue River, and Long Valley

N/A*

N/A*

4, 11, 18 and 26 May 22

3, 12, 18 and 26 May 22

N/A*

N/A*

N/A*

Monitoring of Measures to Minimise Impacts to Ma Tso Lung Stream and Siu Hang San Tsuen Stream

19 May 22

N/A*

19 May 22

19 May 22

N/A*

N/A*

N/A*

Monitoring of Measures to Minimise Impacts on Ecological Sensitive Habitats from Disturbance and Pollution

13 and 24 May 22

13 and 24 May 22

24 May 22

24 May 22

24 May 22

N/A*

N/A*

24-hr RSP (Ambient Arsenic) Monitoring for Land Contamination

5, 11, 17, 23 and 27 May 22

N/A

5, 11, 17, 23 and 27 May 22

N/A

N/A

N/A

N/A

Water Quality Monitoring

N/A

3, 5, 7, 10, 12, 14, 16, 18, 20, 23, 25, 27 and 30 May 22

N/A

3, 5, 7, 10, 12, 14, 16, 18, 20, 23, 25, 27 and 30 May 22

N/A

N/A

N/A

Landfill Gas Monitoring

30 May 22

N/A

N/A

N/A

N/A

N/A

N/A

Built Heritage Monitoring

N/A

N/A

N/A

N/A

Daily assessment subject to construction works conducted within assessment area

N/A

N/A

Environmental Site Inspection

3, 10, 18, 25 and 31 May 22

4, 11, 20 and 25 May 22

6, 13, 17 and 27 May 22

5, 11, 19 and 26 May 22

3, 10, 16, 23 and 31 May 22

5, 11, 19 and 26 May 22

6, 13, 20, and 27 May 22

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remark:

N/A – No relevant monitoring is required according to updated EM&A Manual

N/A* – No relevant monitoring is required according to Baseline Ecological Monitoring Plan (Table 3.1)

[1] Since the distance between monitoring station CP-KTN-NMS2 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m. The monitoring station is not applicable to ND/2019/03

[2] Since the distance between monitoring station CP-KTN-NMS3 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m. The monitoring station is not applicable to ND/2019/03

[3] Since the distance between monitoring station CP-KTN-NMS1 and site boundary of ND/2019/02 under EP-469/2013 exceeds 300m. The monitoring station is not applicable to ND/2019/02

[4] Since the distance between monitoring station FLN-DMS1 and site boundary of ND/2019/05 under EP-473/2013/A exceeds500m. The monitoring station is not applicable to ND/2019/05

[5] Since the distance between monitoring station FLN-DMS3 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 500m. The monitoring station is not applicable to ND/2019/03 and ND/2019/04

[6] Since the distance between monitoring station FLN-DMS5 and site boundary of ND/2019/05 under EP-473/2013/A exceeds 500m. The monitoring station is not applicable to ND/2019/05

[7] Since the distance between monitoring station CP-FLN-NMS2 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 300m. The monitoring station is not applicable to ND/2019/03 and ND/2019/04.

[8] Since the distance between monitoring station CP-FLN-NMS1 and site boundary of ND/2019/03 under EP-473/2013/A exceeds 300m. The monitoring station is not applicable to ND/2019/03.