13.1
This Monthly EM&A Report presents the
EM&A work undertaken in March 2022 in accordance with Updated EM&A
Manual.
13.2 No Action/Limit Level exceedance were recorded for air quality,
construction noise, ambient arsenic and landfill gas monitoring in the
reporting month. Two (2) Limit Level for DO, five
(5) Limit Level exceedances for turbidity, five (5) Limit Level exceedances for
suspended solids of impact water quality monitoring were recorded. After
investigation, all exceedances were considered non-projected related.
Contract No.
ND/2019/01
13.3
Environmental
site inspection were conducted on 1, 8, 16, 22 and 31 Mar 22 by ET in the reporting month.
Contract No. ND/2019/02
13.4
Environmental
site inspection were conducted on 2, 9, 18, 23 and 30 Mar 22 by ET in the reporting month.
Contract No.
ND/2019/03
13.5
Environmental
site inspection were conducted on 4, 11, 15 and 25 Mar 22 by ET in the reporting month.
Contract No.
ND/2019/04
13.6
Environmental
site inspection were conducted on 3, 10, 16, 24 and 31 Mar 22 by ET in the reporting month.
Contract No.
ND/2019/05
13.7
Environmental
site inspections were conducted on 7, 17, 21 and 28 Mar 22 by ET in the reporting month.
Contract No.
ND/2019/06
13.8
Environmental
site inspections were conducted on 3, 10, 17, 24 and 31 Mar 22 by ET in the reporting month.
Contract No.
ND/2019/07
13.9
Environmental
site inspections were conducted on 4, 11, 14 and 25 Mar 22 by ET in the reporting month.
13.10
There
were Two
environmental complaint for ND/2019/02 received in the reporting month. No notification of summons or
successful prosecutions received in the reporting month.
13.11
The
ET would keep track on the EM&A programme to ensure compliance of
environmental requirements and the proper implementation of all necessary
mitigation measures.
13.12 According to the
environmental audits performed in the reporting month, the following recommendations
were made:
Air
Quality Impact
¡P To regular watering haul road;
¡P To provide vehicle washing
facilities with high pressure water jet at every discernible or designated
vehicle exit point;
¡P To maintain the impervious
material to entirely cover the stockpile of dusty materials; and
¡P To ensure all regulated
machines displayed with valid Non-road Mobile Machinery (NRMM) labels.
Construction
Noise Impact
¡P To ensure compressor was operating
with doors closed.
Water
Impact
¡P To review and implement temporary drainage
system;
¡P To prevent any surface runoff
discharge into Sheung Yuen River, Ma Wat River or public road;
¡P To provide sandbags or
construct berm to prevent any outflow of muddy water from site area;
¡P To ensure all vehicle clear of earth
and mud before leaving site;
¡P To ensure the drainage
facilities would not be clogged with waste or sediment to avoid overflow;
¡P To regularly check the
condition of desilting materials for ensuring proper function;
¡P To regularly maintain and ensure
water treatment facilities proper operation and functioning;
¡P To divert all the water
generated from construction site to de-silting facilities with sufficient
handling capacity before discharge;
and
¡P To avoid or regularly clear the stagnant water in
drip tray;
Waste/Chemical
Management
¡P To dispose of general refuse
properly;
¡P To clear and avoid the oil
stain at site area;
¡P To provide proper storage
area for chemical storage; and
¡P To maintain drip tray for
chemical storage well.
Landfill
Gas Hazard
¡P ¡§No
Smoking¡¨
and ¡§No
Naked Flame¡¨
notices in Chinese and English should be posted prominently around the
construction site.
Land
Contamination
¡P Stockpiling
site(s) should be lined with impermeable sheeting and bunded. Stockpiles should
be properly covered by impermeable sheeting to reduce dust emission during dry
season or contaminated run-off during rainy season. Watering should be avoided
on stockpiles of soil to minimize runoff.
Ecology
¡P Properly erect and maintain
2m high solid barriers for protecting Siu Hang San Tsuen Stream.
Permit/
Licences
¡P To display valid Permit or
Licences on site entrance.