Table 10.2       Observations and Recommendations during Site Audits

 

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Waste/ Chemical Management

01/03/2022

Construction waste shall be disposed of regularly.

Improvement/Rectification was observed during follow-up audit session on 8 March 2022.

Air Quality

16/03/2022

Access road should be kept clean and free from dust.

Improvement/Rectification was observed during follow-up audit session on 22 March 2022.

Contract No.: ND/2019/02

Water Quality

23/02/2022

To enhance water mitigation measure to prevent surface runoff to pavement.

Improvement/Rectification was observed during follow-up audit session on 2 March 2022.

Waste/ Chemical Management

23/02/2022

Drip tray should be provided for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 2 March 2022.

Air Quality

02/03/2022

Dusty haul road should be sprayed with water regularly.

Improvement/Rectification was observed during follow-up audit session on 9 March 2022.

Landscape and Visual

02/03/2022

To erect 2m dull green barrier fences around active work area. (3 locations shown in the photo)

Item was remarked as 220309- R01.

09/03/2022

To erect 2m dull green barrier fences around active work area. (3 locations shown in the photo)

Item was remarked as 220318- R01.

18/03/2022

To erect 2m dull green barrier fences around active work area. (3 locations shown in the photo)

Improvement/Rectification was observed during follow-up audit session on 23 March 2022.

Water Quality

23/03/2022

Enhance water mitigation measures to prevent muddy stagnant water runoff.

Improvement/Rectification was observed during follow-up audit session on 30 March 2022.

30/03/2022

Remove the stagnant water inside U-channel.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Water Quality

25/02/2022

To enhance water mitigation measures around water stream near 巨賓, exposed slope of the stream should be covered to prevent further debris from entering the irrigation water channels.

Item was remarked as 220304- O01.

25/02/2022

Wheel-washing Bay should be cleared and cleaned regularly.

Item was remarked as 220304- R01.

04/03/2022

To enhance water mitigation measures around water stream near 巨賓, exposed slope of the stream should be covered to prevent further debris from entering the irrigation water channels.

Improvement/Rectification was observed during follow-up audit session on 11 March 2022.

04/03/2022

Wheel-washing Bay should be cleared and cleaned regularly.

Improvement/Rectification was observed during follow-up audit session on 11 March 2022.

Contract No.: ND/2019/04

Water Quality

23/02/2022

Direct the muddy stagnant water to de-silting facility before discharge to drainage and U-channel. (Portion B)

Item was remarked as 220303- O01.

03/03/2022

Direct the muddy stagnant water to de-silting facility before discharge to drainage and U-channel. (Portion B)

Item was remarked as 220310- O01.

03/03/2022

Dusty stockpile should be covered by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 10 March 2022.

03/03/2022

To enhance the drainage system and the capacity of de-silting facility to prevent surface runoff.

Item was remarked as 220310- R02.

10/03/2022

Direct the muddy stagnant water to de-silting facility before discharge to drainage and U-channel. (Portion B)

Improvement/Rectification was observed during follow-up audit session on 16 March 2022.

10/03/2022

To enhance the drainage system and the capacity of de-silting facility to prevent surface runoff.

Item was remarked as 220316- R01.

16/03/2022

To enhance the drainage system and the capacity of de-silting facility to prevent surface runoff.

Item was remarked as 220324- R01.

24/03/2022

To enhance the drainage system and the capacity of de-silting facility to prevent surface runoff.

Item was remarked as 220331- R01.

24/03/2022

To clear the U-channel regularly.

Improvement/Rectification was observed during follow-up audit session on 31 March 2022.

31/03/2022

To enhance the drainage system and the capacity of de-silting facility to prevent surface runoff.

Follow-up action is needed to be reported in the following month.

Waste/ Chemical Management

16/03/2022

To clear the oil stain on the ground.

Improvement/Rectification was observed during follow-up audit session on 24 March 2022.

Ecology

31/03/2022

Silt curtain was observed oversized and bulky. Please rectify to make sure the silt curtain function properly.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Air Quality

28/02/2022

Dusty worksite shall be watered regularly.

Improvement/Rectification was observed during follow-up audit session on 7 March 2022.

07/03/2022

NRMM label shall be displayed on regulated machine.

Improvement/Rectification was observed during follow-up audit session on 17 March 2022.

17/03/2022

Dusty worksite shall be watered regularly.

Improvement/Rectification was observed during follow-up audit session on 21 March 2022.

21/03/2022

Dusty stockpile shall be covered properly by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 28 March 2022.

28/03/2022

Site entrance should be kept clean and free from dust.

Follow-up action is needed to be reported in the following month.

Water Quality

28/02/2022

To enhance water mitigation measure to prevent surface runoff.

Improvement/Rectification was observed during follow-up audit session on 7 March 2022.

21/03/2022

Replace broken sandbags to prevent surface runoff.

Improvement/Rectification was observed during follow-up audit session on 28 March 2022.

Waste/ Chemical Management

07/03/2022

Drip tray shall be provided for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 17 March 2022.

17/03/2022

General refuse shall be disposed of regularly.

Improvement/Rectification was observed during follow-up audit session on 21 March 2022.

Contract No.: ND/2019/06

Waste/ Chemical Management

03/03/2022

Drip tray should be provided for chemical storage.

Item was remarked as 220310- R01.

10/03/2022

Drip tray should be provided for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 17 March 2022.

Contract No.: ND/2019/07

 

--

--

--

--