Table 10.2
Observations and Recommendations during Site Audits
|
Date |
Observations and Recommendations |
Follow-up |
Contract No.: ND/2019/01 |
|||
Waste/ Chemical Management |
01/03/2022 |
Construction waste shall be disposed of regularly. |
Improvement/Rectification
was observed during follow-up audit session on 8 March 2022. |
Air Quality |
16/03/2022 |
Access road should be kept clean and free from dust. |
Improvement/Rectification
was observed during follow-up audit session on 22 March 2022. |
Contract No.: ND/2019/02 |
|||
Water Quality |
23/02/2022 |
To enhance water mitigation measure to prevent
surface runoff to pavement. |
Improvement/Rectification was observed during
follow-up audit session on 2 March 2022. |
Waste/ Chemical Management |
23/02/2022 |
Drip tray should be provided for chemical
storage. |
Improvement/Rectification was observed during
follow-up audit session on 2 March 2022. |
Air Quality |
02/03/2022 |
Dusty haul road should be sprayed with water
regularly. |
Improvement/Rectification was observed during
follow-up audit session on 9 March 2022. |
Landscape and Visual |
02/03/2022 |
To erect 2m dull green barrier fences around
active work area. (3 locations shown in the photo) |
Item was remarked as 220309- R01. |
09/03/2022 |
To erect 2m dull green barrier fences around
active work area. (3 locations shown in the photo) |
Item was remarked as 220318- R01. |
|
18/03/2022 |
To erect 2m dull green barrier fences around
active work area. (3 locations shown in the photo) |
Improvement/Rectification was observed during
follow-up audit session on 23 March 2022. |
|
Water Quality |
23/03/2022 |
Enhance water mitigation measures to prevent
muddy stagnant water runoff. |
Improvement/Rectification was observed during
follow-up audit session on 30 March 2022. |
30/03/2022 |
Remove the stagnant water inside U-channel. |
Follow-up action is needed to be reported in the
following month. |
|
Contract No.: ND/2019/03 |
|||
Water Quality |
25/02/2022 |
To enhance water
mitigation measures around water stream near 巨賓, exposed slope of the
stream should be covered to prevent further debris from entering the
irrigation water channels. |
Item was remarked as 220304- O01. |
25/02/2022 |
Wheel-washing Bay should
be cleared and cleaned regularly. |
Item was remarked as 220304- R01. |
|
04/03/2022 |
To enhance water
mitigation measures around water stream near 巨賓, exposed slope of the
stream should be covered to prevent further debris from entering the
irrigation water channels. |
Improvement/Rectification was observed during
follow-up audit session on 11 March 2022. |
|
04/03/2022 |
Wheel-washing Bay should
be cleared and cleaned regularly. |
Improvement/Rectification was observed during
follow-up audit session on 11 March 2022. |
|
Contract No.: ND/2019/04 |
|||
Water Quality |
23/02/2022 |
Direct the muddy stagnant
water to de-silting facility before discharge to drainage and U-channel.
(Portion B) |
Item was remarked as 220303- O01. |
03/03/2022 |
Direct the muddy stagnant
water to de-silting facility before discharge to drainage and U-channel.
(Portion B) |
Item was remarked as 220310- O01. |
|
03/03/2022 |
Dusty stockpile should be
covered by impervious sheeting. |
Improvement/Rectification was observed during
follow-up audit session on 10 March 2022. |
|
03/03/2022 |
To enhance the drainage
system and the capacity of de-silting facility to prevent surface runoff. |
Item was remarked as 220310- R02. |
|
10/03/2022 |
Direct the muddy stagnant
water to de-silting facility before discharge to drainage and U-channel.
(Portion B) |
Improvement/Rectification was observed during
follow-up audit session on 16 March 2022. |
|
10/03/2022 |
To enhance the drainage
system and the capacity of de-silting facility to prevent surface runoff. |
Item was remarked as 220316- R01. |
|
16/03/2022 |
To enhance the drainage
system and the capacity of de-silting facility to prevent surface runoff. |
Item was remarked as 220324- R01. |
|
24/03/2022 |
To enhance the drainage
system and the capacity of de-silting facility to prevent surface runoff. |
Item was remarked as 220331- R01. |
|
24/03/2022 |
To clear the U-channel
regularly. |
Improvement/Rectification was observed during
follow-up audit session on 31 March 2022. |
|
31/03/2022 |
To enhance the drainage
system and the capacity of de-silting facility to prevent surface runoff. |
Follow-up action is needed to be reported in the
following month. |
|
Waste/ Chemical Management |
16/03/2022 |
To clear the oil stain on
the ground. |
Improvement/Rectification was observed during
follow-up audit session on 24 March 2022. |
Ecology |
31/03/2022 |
Silt curtain was observed
oversized and bulky. Please rectify to make sure the silt curtain function
properly. |
Follow-up action is needed to be reported in the
following month. |
Contract No.: ND/2019/05 |
|||
Air Quality |
28/02/2022 |
Dusty worksite shall be
watered regularly. |
Improvement/Rectification was observed during
follow-up audit session on 7 March 2022. |
07/03/2022 |
NRMM label shall be
displayed on regulated machine. |
Improvement/Rectification was observed during
follow-up audit session on 17 March 2022. |
|
17/03/2022 |
Dusty worksite shall be
watered regularly. |
Improvement/Rectification was observed during
follow-up audit session on 21 March 2022. |
|
21/03/2022 |
Dusty stockpile shall be
covered properly by impervious sheeting. |
Improvement/Rectification was observed during
follow-up audit session on 28 March 2022. |
|
28/03/2022 |
Site entrance should be
kept clean and free from dust. |
Follow-up action is needed to be reported in the
following month. |
|
Water Quality |
28/02/2022 |
To enhance water
mitigation measure to prevent surface runoff. |
Improvement/Rectification was observed during
follow-up audit session on 7 March 2022. |
21/03/2022 |
Replace broken sandbags to
prevent surface runoff. |
Improvement/Rectification was observed during
follow-up audit session on 28 March 2022. |
|
Waste/ Chemical Management |
07/03/2022 |
Drip tray shall be
provided for chemical storage. |
Improvement/Rectification was observed during
follow-up audit session on 17 March 2022. |
17/03/2022 |
General refuse shall be
disposed of regularly. |
Improvement/Rectification was observed during
follow-up audit session on 21 March 2022. |
|
Contract No.: ND/2019/06 |
|||
Waste/ Chemical Management |
03/03/2022 |
Drip tray should be provided for chemical
storage. |
Item
was remarked as 220310- R01. |
10/03/2022 |
Drip tray should be provided for chemical
storage. |
Improvement/Rectification
was observed during follow-up audit session on 17 March 2022. |
|
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |