Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

--

--

--

--

Contract No.: ND/2019/02

Water Quality

08/06/2022

Muddy surface runoff were observed entering water bodies such as drainage, spilling pass pre-existing sandbags and earth bunds. Contractor was urged to enhance water mitigation measures immediately, to ensure no further muddy runoff will enter water bodies, especially throughout rainy season.

Improvement/Rectification was observed during follow-up audit session on 17 June 2022.

Air Quality

01/06/2022

Faded NRMM label shall be replaced.

Improvement/Rectification was observed during follow-up audit session on 8 June 2022.

Waste / Chemical Management

17/06/2022

Drip tray should be provided for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 23 June 2022.

Ecology

25/05/2022

The silt curtain should be properly surrounded the works and ensure it is intact.

Improvement/Rectification was observed during follow-up audit session on 1 June 2022.

17/06/2022

Silt curtain should be properly maintained.

Improvement/Rectification was observed during follow-up audit session on 23 June 2022.

Contract No.: ND/2019/03

--

--

--

--

Contract No.: ND/2019/04

Water Quality

 

 

 

Air Quality

02/06/2022

The stockpiles of dusty materials should be covered properly at the site area next to wholesale market.

Improvement/Rectification was observed during follow-up audit session on 8 June 2022.

23/06/2022

To replace faded NRMM labels.

Improvement/Rectification was observed during follow-up audit session on 23 June 2022.

Waste / Chemical Management

16/06/2022

General refuse should be disposed of regularly and properly.

 

Contract No.: ND/2019/05

Air Quality

20/06/2022

Dusty stockpile should be covered by impervious sheets properly.

Improvement/Rectification was observed during follow-up audit session on 27 June 2022.

27/06/2022

Dusty stockpile should be covered by impervious sheeting properly.

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

20/06/2022

Drip tray should be provided properly.

Improvement/Rectification was observed during follow-up audit session on 27 June 2022.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--