11.1 Two (2)
Action Level and Six (6) Limit Level for DO, Nine (9) Limit Level for
turbidity, and Nine (9) Limit Level for Suspended Solids of impact water
quality monitoring were recorded. After investigation, all exceedances were
considered due to the other external factors rather than the contract works. No
Action/Limit Level exceedance for air quality, construction noise, ambient
arsenic, landfill gas monitoring and build heritage monitoring was recorded in
the reporting month. The summary of exceedance recorded
in the reporting month is shown in Appendix O.
11.2 Ecological monitoring was carried out in the reporting
month. The results will be compared with Action and Limit Levels after issuance
of the Final Baseline Ecological Report.
11.3 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried out.
11.4 No environmental non-compliance was recorded in the
reporting month.
11.5 Five
environmental complaints for ND/2019/01, ND/2019/04 and ND/2019/05 were
received in the reporting month. The Cumulative
Complaint Log since the commencement of the Project is presented in Appendix S.
11.6
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.