Table 2.3     Summary Table for Major Site Activities in the Reporting Month

 

Contract No.

Site Activities (July 2022)

ND/2019/01

(a)           Site clearance, tree felling, removal of existing structure s, site formation and G.I works at Portion 1a

(b)           Sheet piling, excavation, backfilling and drainage works at Portion 1b

(c)           Site clearance, removal of existing structures and site formation at Portion 1c and 1e

(d)          Site clearance, tree felling and site formation at Portion 2

(e)           Site clearance, excavation, backfilling and drainage works at Portion 3

(f)            Drainage works, watermain, excavation, backfilling and road work at Portion 5

(g)           Construction of retaining wall, drainage works, and backfilling at Portion 6a

(h)           Operation of HAC soil treatment facility at Portion 6b

(i)            Site formations, sheet piling, excavation and drainage works at Portion 7

(j)            Construction of retaining wall, slope drainage and maintenance access construction, RC construction of flushing water service reservoir and fresh water service reservoir, GI works and backfilling works at Portion 8a

(k)           ELS for jacking pit at LWSC¡¦s car park and excavation for receiving pit and trenchless work at Portion 8b

(l)            Sheet piling, excavation, drainage works and construction of retaining wall at Portion 9b

(m)         Stockpile of soil and excavation. at Portion 9c

(n)           Excavation, sheet piling for ELS, drainage works, road works and utilities works at Portion 10a

(o)           Sheet piling and excavation at Portion 10b

(p)           Construction of MBR at Portion 11b

(q)           Construction of CLC at Portion 16

ND/2019/02

(a)             Pipe Jacking

(b)             Backfilling

(c)             Concreting

(d)            Bedding and pipe laying

(e)             ELS

(f)              Sheet Pile Installation

(g)             Cut and Fill of Slope

ND/2019/03

(a)        Portion 1 & Portion 1A

-            Drainage works at Yin Kong Road

-            Construction of Pai Lau

(b)         Long Valley

-          Erection of Permanent Boundary Structure

-          Construction of Compacted Earth Bund / Walkway

-          Construction of Ditches

-          Construction of Irrigation Channel

-          Construction of Decking & Sluices

-          Construction of Wetland Boardwalk

-          Construction of Type 1 Storage House

-          Construction of Type 2 Storage House

-          Construction of Tea House

-          Construction of Composting Facility

-          Construction of Bird Hide

-          Construction of Outdoor Classroom

-          Construction of Storage Sheds

-          Wetland Creation & Restoration works

ND/2019/04

(a)           Tree felling

(b)          Predrill

(c)           Bored piling

(d)          Excavation

(e)           Sheet piling and ELS

ND/2019/05

(a)            The rotary drilling rigs, one is located at C2-02 and C2-03. The second is located at B2-02. The third one is located at E3-04. The RCD rig located at D2-01.

(b)            C4-01 Portal Beam, C4-03 cross head, E2-02 SOP cast in-situ and E3-03 SOP cast in-situ are in progress.

(c)            TWSR-East drainage and watermain from Ch100 to Ch450 install works are in progress.

ND/2019/06

The construction phase was completed and handed over to AFCD since 4 April 2022.

ND/2019/07

(a)           Site clearance at Portion 4

(b)           Erection of site hoarding at Portion 4

(c)           C&D waste disposal in Portion 1, 2, 4 and 5

(d)           Drainage works and Sewerage works at Portion 1, 3 and 4

(e)           Construction of box culvert in Portion 2

(f)            Filling works in Portion 1, 2 and 4

(g)           Construction of site haul road in Portion 4

(h)           Waterworks at Portion 1