Table IV       Summary Table for Site Activities in the coming Two Months

Contract No.

Site Activities (February 2022 and March 2022)

ND/2019/01

 

(a)          Site Clearance, remove of existing structures and tree felling in Portion 1a

(b)         Site clearance, ground investigation, sheet piling, excavation and drainage in Portion 1b

(c)          Site Clearance and remove of existing structures in Portion 1e

(d)         Site clearance, tree felling and temporary road construction in Portion 2

(e)          Site clearance, backfilling, excavation and tree felling in Portion 3

(f)          Site clearance, sheet piling and excavation, drainage works and temporary road construction in Portion 5

(g)         Site Clearance, sheet piling and excavation, pipes laying, backfilling, construction of KB01 retaining wall, haul road construction in Portion 6a

(h)         Operation of HAC treatment facility in Portion 6b

(i)           Site clearance, sheetpiling and excavation, pipes laying and construction of APLR in Portion 7

(j)           Construction of retaining Wall, slope cutting, slope drainage and maintenance access construction, RC construction of flushing water service reservoir and fresh water reservoir, construction of temporary haul road in Portion 8a

(k)         Sheet piling for receiving pit, trenchless works, excavation in Portion 8b

(l)           Sheet piling and excavation, pipes laying, demolition of existing structures, GI works in Portion 9b

(m)       Stockpile of soil and excavation in Portion 9c

(n)         Excavation, sheetpiling for ELS, drainage works and road construction in Portion 10a

(o)         Sheetpiling and excavation, drainage works in Portion 10b

(p)         Construction of MBR at 11b

(q)         Construction of temporary sewage pumping station in Portion 14

ND/2019/02

(a)          Pipe Jacking

(b)         ELS

(c)          Concreting

(d)         Backfilling

(e)          Sheet Pile Installation

(f)          Bedding and Pipe Laying

(g)         Cut and Fill of Slope

ND/2019/03

 

(a)        Portion 1 & Portion 1A

-            Drainage works at Yin Kong Road

-            Construction of Pai Lau

(b)       Long Valley

-          Erection of Permanent Boundary Structure

-          Construction of Compacted Earth Bund / Walkway

-          Construction of Ditches

-          Construction of Irrigation Channel

-          Construction of Decking & Sluices

-          Construction of Wetland Boardwalk

-          Construction of Type 1 Storage House

-          Construction of Type 2 Storage House

-          Construction of Tea House

-          Construction of Composting Facility

-          Construction of Bird Hide

-          Construction of Outdoor Classroom

-          Construction of Storage Sheds

-          Wetland Creation & Restoration works

ND/2019/04

 

(a)           Site clearance

(b)           Tree felling

(c)           Predrill

(d)           Bored piling

(e)           Excavation

(f)            Sheet piling

(g)           ELS

ND/2019/05

(a)           North Team Works

-          Pre-drilling for bored piles at B1 & B2(Portion II), C1(Portion II) & C1-03

-          Bored piling at B1(Portion I), B1&B2(Portion II), C1(Portion II), C1-01bM, C1-02b, C1-03, C1-04, C2-01, C2-02, C2-03a, C2-03b, C3-02, C3-03a, C3-04a, D2-01, E2-01

-          ELS and Pile cap construction at C3-03b, C3-04b, C4-03, C4-04a, C4-04b, D1-01, D1-02, D1-03, D1-04, E1-01, E1-02, E1-03 & E1-04

-          Bailey bridge construction near C1-02

-          Piling platform & haul road construction from B2-03 to C1-02a at Portion II

-          Footing construction at C4-02

-          Pier construction at C3-03b, C4-03, C4-04aM, C4-04bM, D1-01, E1-01, E1-02, E1-03 & E1-04

(b)          Viaduct Works

-          Installation of the 4th to 5th typical segment mould and SOP mould to be completed by the end of Dec 2021

-          Fabrication of 6th to 8th typical segment mould to be completed by the end of Feb 2022

-          1st SOP is targeted to cast by the end of Jan 2022

-          Target to cast in 13 segments in Jan 2022 and 16 segments in Feb 2022

-          Fabrication of launching girder (LG) is in progress. Start LG delivery to HK site in Jan 2022

-          Fabrication of 1st set Form Travel (FT) is targeted to complete in Jan 2022 and delivery to HK site in the end of Jan 2022

-          Bridge rotation design of Pier E2-01 submits to ICE endorsement in Jan 2022. The design of Pier D2-01 to be completed in Jan 2022 and ICE endorsement in Feb 2022

-          Complete ground beams of segment motorized trolley in CTC yard in Jan 2022

(c)           South Team Works

-          Venton Area – Gas main laying, 11kv and 132kv cross road duct laying

-          Portion 13 – DN1200 storm drain construction

-          Portion 17 and 18 – Construction of DN 600 and DN450 sewer. RW 52 bay 6

-          Portion 18 – Gas main laying

-          TWSR (West) – RW06 construction and FS04 slope works

-          HKY FB (East) – construction of LT1, P02

-          Portion 11 – DN1200 and DN600 watermain laying work

-          E2-02 pier – construction of tower crane foundation

-          E2-03 – Pile cap construction

-          E3-01 – Pile cap construction

-          E3-03 – Pier construction

-          D2-02 – Pile cap construction

-          D2-03 – Piling works

ND/2019/06

 

(a)          Rectification works for T&C of E&M installations for the steel canopy, MOB and additional water tank and pump house at Portion 3

(b)         Electrical board installations at stall area under the steel canopy at Portion 3

(c)          Application of additional coating and colour strip painting on stall area at Portion 3

(d)         Finishing works for the additional water tank and pump house at Portion 3

(e)          Flag pole installation at Portion 3

(f)          Installation of handrails at MOB at Portion 4 and new pump house at Portion 3

(g)         Road marking / stall marking at Portion 3

(h)         Joint sealant application for carriageway at Portion 3

(i)           CI covers and grating installation at Portion 3

(j)           Road light installation at Portion 3

(k)         Pipe connection to existing drainage MH at Interim Stage Market at Portion 1

(l)           Drainage system cleaning and CCTV record at Portion 3

(m)       Installation of signage of the market at Portion 3

ND/2019/07

(a)        Site clearance at Portion 4 and 5

(b)        Erection of site hoarding at Portion 4

(c)        C&D waste disposal at Portion 1, 2, 4 and 5

(d)        G.I. works at Portion 4 and 5

(e)        Construction of box culvert at Portion 2

(f)         Filling works at Portion 1, 2 and 4

(g)        Tree felling/ Disposal of yard waste at Portion 4

(h)        Construction of site haul road at Portion 4

(i)         Drainage works and sewage works at Portion 1, 3 and 4

(j)         Main piling works and Portion 5