Table 10.4 Specific Air Quality and Noise Mitigation Measures for Major
Construction Works in the Reporting Month
Works Contracts |
Photographic Records |
|
ND/2019/01 |
Hard paved exposed
slope surface |
Access road watered
regularly |
ND/2019/02 |
Hard paved exposed
haul road |
Hard paved exposed slope surface |
ND/2019/03 |
Deployment of noise
barriers between construction site and NSRs |
Dusty material
covered by impervious sheeting |
ND/2019/04 |
Access road watered regularly |
Regulated machines display with Non-road Mobile Machinery labels |
ND/2019/05 |
Covering dusty
stockpile |
Access road watered regularly |
ND/2019/06 |
Covering dusty stockpile |
Hard paved exposed haul road |
ND/2019/07 |
Covering exposed slope surface with tarpaulin |
Vehicle washing facilities at exit point |