Table 10.4       Specific Air Quality and Noise Mitigation Measures for Major Construction Works in the Reporting Month

Works Contracts

Photographic Records

ND/2019/01

Hard paved exposed slope surface

Access road watered regularly

ND/2019/02

Hard paved exposed haul road

Hard paved exposed slope surface

ND/2019/03

Deployment of noise barriers between construction site and NSRs

Dusty material covered by impervious sheeting

ND/2019/04

Access road watered regularly

Regulated machines display with Non-road Mobile Machinery labels

ND/2019/05

Covering dusty stockpile

Access road watered regularly

ND/2019/06

Covering dusty stockpile

Hard paved exposed haul road

ND/2019/07

Covering exposed slope surface with tarpaulin

Vehicle washing facilities at exit point