Table 10.2       Observations and Recommendations during Site Audits

 

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Waste/ Chemical Management

28/12/2021

Drip tray should be provided for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 4 January 2022.

25/01/2022

Chemical waste shall be labelled clearly.

Improvement/Rectification was observed during follow-up audit session on 31 January 2022.

Contract No.: ND/2019/02

Air Quality

21/01/2022

Dusty haul road should be sprayed with water regularly.

Improvement/Rectification was observed during follow-up audit session on 26 January 2022.

Water Quality

29/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Improvement/Rectification was observed during follow-up audit session on 5 January 2022.

29/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Improvement/Rectification was observed during follow-up audit session on 5 January 2022.

29/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (North Bridge)

Improvement/Rectification was observed during follow-up audit session on 5 January 2022.

29/12/2021

Clear and treat the stagnant muddy water inside the U-Channel with desilting facilities before discharge. (North Bridge)

Improvement/Rectification was observed during follow-up audit session on 5 January 2022.

12/01/2022

Enhance water mitigation measure to prevent muddy water runoff to U-channel.

Improvement/Rectification was observed during follow-up audit session on 21 January 2022.

21/01/2022

Clear the stagnant water insider the U-channel.

Improvement/Rectification was observed during follow-up audit session on 26 January 2022.

31/01/2022

Enhance water mitigation measure to prevent muddy water runoff to U-channel.

Follow-up action is needed to be reported in the following month.

Ecology

26/01/2022

Erect 2m high dull green barrier around active works area.

Item was remarked as 220131-R01. Follow-up action is needed to be reviewed.

31/01/2022

Erect 2m high dull green barrier around active works area.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

14/01/2022

Dusty stockpiles should be properly covered with impervious sheeting.

Item was remarked as 220118-R01. Follow-up action is needed to be reviewed.

18/01/2022

Dusty stockpiles should be properly covered with impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 28 January 2022.

Water Quality

31/12/2021

To clean wheel-washing bay regularly.

Improvement/Rectification was observed during follow-up audit session on 7 January 2022.

18/01/2022

Wheel-washing bay should be cleared regularly.

Item was remarked as 220128-R01. Follow-up action is needed to be reviewed.

18/01/2022

To enhance water mitigation measures around water stream near 巨賓.

Item was remarked as 220128-R02. Follow-up action is needed to be reviewed.

28/01/2022

Wheel-washing bay should be cleared regularly.

Follow-up action is needed to be reported in the following month.

28/01/2022

To enhance water mitigation measures around water stream near 巨賓.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Air Quality

06/01/2022

Faded NRMM label shall be replaced.

Improvement/Rectification was observed during follow-up audit session on 14 January 2022.

20/01/2022

Faded NRMM label shall be replaced.

Item was remarked as 220127-R01. Follow-up action is needed to be reviewed.

27/01/2022

Faded NRMM label shall be replaced.

Follow-up action is needed to be reported in the following month.

Noise

 

30/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Item was remarked as 220106-R01. Follow-up action is needed to be reviewed.

06/01/2022

To enhance noise mitigation measures along Shek Wu San Tsuen.

Improvement/Rectification was observed during follow-up audit session on 14 January 2022.

Water Quality

14/01/2022

Clear the sediment and debris along the U-channel.

Improvement/Rectification was observed during follow-up audit session on 20 January 2022.

20/01/2022

Clear the sediment and provide desilting facilities inside the drainage.

Item was remarked as 220127-R02. Follow-up action is needed to be reviewed.

27/01/2022

Clear the sediment and provide desilting facilities inside the drainage.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Air Quality

03/01/2022

Stockpile should be covered by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 10 January 2022.

24/01/2022

Dusty stockpile should be covered by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 31 January 2022.

Water Quality

28/12/2021

Enhance mitigation measures to prevent surface runoff to Ma Wat River.

Improvement/Rectification was observed during follow-up audit session on 3 January 2022.

10/01/2022

Enhance water mitigation measure to prevent muddy water runoff to the U-channel.

Improvement/Rectification was observed during follow-up audit session on 20 January 2022.

Waste / Chemical Management

20/01/2022

Clear the oil stains on the ground.

 

Improvement/Rectification was observed during follow-up audit session on 24 January 2022.

Contract No.: ND/2019/06

Ecology

13/01/2022

Dull green hoarding should be properly maintained.

Improvement/Rectification was observed during follow-up audit session on 18 January 2022.

27/01/2022

Dull green hoarding should be properly maintained.

Improvement/Rectification was observed during follow-up audit session on 31 January 2022.

Water Quality

18/01/2022

Clear the stagnant water and avoid chemical leakage to U-channel.

Improvement/Rectification was observed during follow-up audit session on 27 January 2022.

31/01/2022

Exposed slope surface should be covered.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/07

 

--

--

--

--