Table 2.3     Summary Table for Major Site Activities in the Reporting Month

Contract No.

Site Activities (October 2021)

ND/2019/01

(a)          Site clearance in Portion 1a, 1b and 1e

(b)         Site clearance and tree felling in Portion 2

(c)          Site clearance, excavation and backfilling in Portion 3

(d)         Site Clearance, stockpile of soil, construction of KW01 retaining wall, sheetpiling and excavation, pipes laying and drainage workd in Portion 5

(e)          Site Clearance, excavation, construction of KW01 retaining wall and drainage worksin Portion 6a

(f)          Operation of HAC soil treatment facility in Portion 6b

(g)         Site Clearance, Construction of temporary road for alternative Po Lau Road, Construction of site accommodation in Area T2 and T3, sheetpiling and excavation, pipes laying, footing of Noise Barriers in Portion 7

(h)         Construction of Retaining Wall, slope cutting, soil nailing, slope drainage and maintenance access construction, excavation for Fresh Water Service Reservoir, RC construction of Flushing Water Service Reservoir in Portion 8a

(i)           Drill and grouting for jacking pit, site clearance and excavation in Portion 8b

(j)           Sheetpiling and excavation, drainage work, GI works and demolition of existing structures in Portion 9b

(k)         Stockpile of soil and excavation in Portion 9c

(l)           Excavation, sheetpiling for ELS, drainage work and noise barriers footing in Portion 10a

(m)       Sheetpiling and excavation in Portion 10b

(n)         Laying of rising mains, construction of MBR in Portion 11b

(o)         Sheetpiling and excavation , Construction of temporary sewage pumping station in Portion 14

(p)         Construction of CLC in Portion 16

ND/2019/02

(a)          Tree felling

(b)         ELS

(c)          Hoarding erection

(d)         Construction of pile cap

ND/2019/03

(a)          Portion 1

-          Demolition of Existing Structure in Portion 1A “巨賓

-            Demolition of concrete warehouse “巨賓

-            Road work and drainage work at Yin Kong Road

(b)         Portion 2 to Portion 20C

-          Erection of Permanent Boundary Structure

-          Construction of Irrigation Channel

-          Construction of Type 1 Storage House

-          Construction of Type 2 Storage House

-          Construction of Composting Facility

-          Construction of Bird Hide

-          Construction of Outdoor Classroom

-          Construction of Storage Sheds

-          Wetland Creation & Restoration works

 

 

ND/2019/04

(a)           Site clearance

(b)           Tree felling

(c)           Predrill

(d)           Bored piling

(e)           Excavation

(f)            Sheet piling

ND/2019/05

(a)            Pre-drilling of B1, B2 and C1 in Portion II.

(b)           Bored Piles of C3-04b, C2-04, C3-04b

(c)            C4-01a, C4-01 and E2-02 pile cap concreting

(d)           Abutment rebar fixing work for LT1, PO2 and AB1

(e)            TWSR-West widening road works for the pier D2-03 construction

ND/2019/06

(a)          Finishing works and E&M installations for the Management Office Building (MOB) at Portion 4.

(b)         Erection of the steel members and seam roof of steel canopy at Portion 3.

(c)          E&M installations for the steel canopy at Portion 3.

(d)         Construction of concrete carriageway at Portion 3.

(e)          Construction of underground utilities in the final stage market at Portion 3.

(f)          Installation of sheet piles for ELS for footings of additional carriageway steel cover at Portion 3.

(g)         Construction of footings of additional carriageway steel cover at Portion 3.

(h)         Construction of walls and columns of additional water tank and pump house at Portion 3.

ND/2019/07

(a)            Site clearance at Portion 1 and 2

(b)           Erection of site hoarding at Portion 1

(c)            C&D waste disposal in Portion 1 and 2

(d)           G.I. works at Portion 3, 4 and 5

(e)            Construction of box culvert in Portion 2

(f)            Filling works in Portion 1 and 2

(g)           Tree felling / Disposal of yard waste in Portion 1 and 2

(h)           Construction of site haul road in Portion 1

(i)             Demolition of villagers houses in Portion 4

(j)             Drainage Works, Sewage Works in Portion 1 and 3