Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Contract
No. |
Site
Activities (October 2021) |
ND/2019/01 |
(a)
Site clearance in Portion 1a, 1b and 1e (b)
Site clearance and tree felling in Portion 2 (c)
Site clearance, excavation and backfilling in Portion 3 (d)
Site Clearance, stockpile of soil, construction of KW01 retaining
wall, sheetpiling and excavation, pipes laying and drainage
workd in Portion 5 (e)
Site
Clearance, excavation, construction of KW01 retaining wall and drainage worksin Portion 6a (f)
Operation
of HAC soil treatment facility in Portion 6b (g)
Site Clearance, Construction of temporary road for alternative Po
Lau Road, Construction of site accommodation in Area T2 and T3, sheetpiling and excavation, pipes laying, footing of
Noise Barriers in Portion 7 (h)
Construction of Retaining Wall, slope cutting, soil nailing,
slope drainage and maintenance access construction, excavation for Fresh
Water Service Reservoir, RC construction of Flushing Water Service Reservoir in
Portion 8a (i)
Drill and grouting for jacking pit, site clearance and excavation
in Portion 8b (j)
Sheetpiling and
excavation, drainage work, GI works and demolition of existing structures in
Portion 9b (k)
Stockpile of soil and excavation in Portion 9c (l)
Excavation, sheetpiling for ELS, drainage
work and noise barriers footing in Portion 10a (m)
Sheetpiling and excavation in Portion 10b (n)
Laying of rising mains, construction of MBR in
Portion 11b (o)
Sheetpiling and excavation , Construction of temporary sewage pumping
station in
Portion 14 (p)
Construction of CLC in Portion 16 |
ND/2019/02 |
(a)
Tree
felling (b)
ELS (c)
Hoarding
erection (d)
Construction
of pile cap |
ND/2019/03 |
(a)
Portion 1 -
Demolition
of Existing Structure in Portion 1A “巨賓” -
Demolition of concrete warehouse “巨賓” -
Road work and drainage work at Yin
Kong Road (b)
Portion 2
to Portion 20C -
Erection
of Permanent Boundary Structure -
Construction of Irrigation Channel -
Construction of Type 1 Storage House -
Construction of Type 2 Storage House -
Construction of Composting Facility -
Construction of Bird Hide -
Construction of Outdoor Classroom -
Construction of Storage Sheds -
Wetland Creation & Restoration
works |
ND/2019/04 |
(a)
Site clearance (b)
Tree felling (c)
Predrill (d)
Bored piling (e)
Excavation (f)
Sheet piling |
ND/2019/05 |
(a)
Pre-drilling of B1, B2 and C1 in Portion II. (b)
Bored Piles of C3-04b, C2-04, C3-04b (c)
C4-01a, C4-01 and E2-02 pile cap concreting (d)
Abutment rebar fixing work for LT1, PO2 and AB1 (e)
TWSR-West widening road works for the pier D2-03
construction |
ND/2019/06 |
(a)
Finishing works and E&M installations for the Management
Office Building (MOB) at Portion 4. (b)
Erection of the steel members and seam roof of steel canopy at
Portion 3. (c)
E&M installations for the steel canopy at Portion 3. (d)
Construction of concrete carriageway at Portion 3. (e)
Construction of underground utilities in the final stage market
at Portion 3. (f)
Installation of sheet piles for ELS for footings of additional
carriageway steel cover at Portion 3. (g)
Construction of footings of additional carriageway steel cover at
Portion 3. (h)
Construction of walls and columns of additional water tank and
pump house at Portion 3. |
ND/2019/07 |
(a)
Site clearance at Portion 1 and 2 (b)
Erection of site hoarding at Portion 1 (c)
C&D waste disposal in Portion 1 and 2 (d)
G.I. works at Portion 3, 4 and 5 (e)
Construction of box culvert in Portion 2 (f)
Filling works in Portion 1 and 2 (g)
Tree felling / Disposal of yard waste in Portion 1 and 2 (h)
Construction of site haul road in Portion 1 (i)
Demolition of villager’s houses in Portion 4 (j)
Drainage Works, Sewage Works in Portion 1
and 3 |