11.1
One (1) Action Level exceedance and
fifteen (15) Limit Level exceedances for dissolved oxygen, eight (8) Limit
level exceedances for turbidity, seven (7) Limit Level exceedances for
suspended solids and three (3) Action Level exceedance for arsenic of impact water quality monitoring were recorded.
After investigation, three (3) Limit Level exceedances for dissolved oxygen,
three (3) Limit level exceedances for turbidity and three (3) Limit Level
exceedances for suspended solids at monitoring station, SHST-IS2, were found
due to Contract No. ND/2019/04. Other exceedances were considered non-projected
related.
11.2
No exceedance of
Action and Limit Levels of air quality, construction noise, ambient arsenic and
landfill gas monitoring in the reporting month. The summary of exceedance
record in reporting month is shown in Appendix O.
11.3
Ecological
monitoring was carried out in the reporting month. The Action and Limit Level
will be compared after the issue of Final Baseline Ecological Report.
11.4
Should the monitoring
results of the environmental monitoring parameters at any designated monitoring
stations indicate that the Action / Limit Levels are exceeded, the actions in
accordance with the Event and Action Plans in Appendix N would be carried out.
11.5
No
environmental non-compliance was recorded in the reporting month.
11.6
No environmental
complaint was received in the reporting month. The Cumulative Complaint Log
since the commencement of the Project is presented in Appendix S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.