Table 8.2 Vibration Monitoring Plan
EP. No |
Contract No. |
Monitoring Station (s) |
Distance with Construction
Works |
Monitoring Plan |
EP-473/2013/A |
ND/2019/05 |
FL02 |
Within 50m |
Daily assessment is required |
Within 75m |
Bi-daily assessment is required |
|||
Within 100m |
Weekly assessment is required |
Remarks:
[1] Baseline condition survey was conducted
for built heritage features at HFL05, FL02, FL04, FL24, FL27 and FL36 under
ND/2019/05 for EP-473/2013/A. As HFL05, FL04, FL24, FL27 and FL36 were not
within the assessment area of the related construction work, no construction
vibration monitoring was conducted for the built heritage in the reporting
month.