2.1
The
Kwu Tung North (KTN) and Fanling
North (FLN) New Development Areas (NDAs) are one of the important sources of
land and housing supply in the medium and long term. The development of the KTN
and FLN NDAs will be implemented in phase for full completion by 2031. The
Phase 1 of the NDAs development, comprising the Advance Works and First Stage
Works, is targeted to be implemented from the second half of 2019
progressively. The Advance and First Stage Works would include site formation,
engineering infrastructure works (including roads, drainage, sewerage,
waterworks, landscaping works, pumping stations, and fresh water and flushing
water service reservoirs), soil remediation, reprovisioning
of North District Temporary Wholesale Market, development of a nature park at
Long Valley and implementation of environmental mitigation measures.
2.2
The
scope of works under the Advance and First Stage Works comprises the following:
a)
The
Advance Works (PWP item No. 7747CL-2) consist of:
i)
site
formation of land (including soil remediation) in KTN and FLN NDAs for housing,
community facilities and engineering infrastructure;
ii)
construction
of roads including the eastern section of Fanling
Bypass (FLBP(E)) connecting the FLN NDA to Fanling
Highway and other roads with footpaths and cycle tracks, and associated
junction/ road improvements;
iii)
engineering
infrastructure works including drainage. Sewerage (including two sewage pumping
stations), waterworks (including a fresh water service reservoir and a flushing
water service reservoir in the KTN NDA), landscape works and slopeworks;
iv)
part
expansion and upgrading of Shek Wu Hui Sewage
Treatment Works (SWHSTW);
v)
reprovisioning works; and
vi)
implementation of environmental mitigation measures and environmental
monitoring and audit (EM&A) programme for the
works mentioned in (i) to (v) above.
b)
The
First Stage Works (PWP item No. 7759CL) consist of:
i)
development
of a nature park at Long Valley including provision of a visitor centre and a footbridge spanning across Sheung
Yue River for connection between these two facilities;
ii)
reprovisioning of two egretry sites in the FLN
NDA and enhancement works to an existing egretry site
in the KTN NDA;
iii)
site
formation of land for a village resite area and a
district police station in the KTN NDA;
iv)
engineering
infrastructure works including roads, drainage, sewerage, waterbirds,
and landscape works; and
v)
implementation of environmental mitigation measures and environmental
monitoring and audit (EM&A) programme for the
works mentioned in (i) to (iv) above.
2.3
The
Project which covers KTN and FLN NDAs is a designated project (DP) under Schedule
3 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499). In October
2013, the EIA Report (AEIAR-175/2013) for the Project was approved by the Director
of Environmental Protection pursuant to the EIA Ordinance. The relevant EPs
under the Project and the respective Work Contracts are summarized in Table
2.1.
Table 2.1 Summary
of EPs under the Project and the Respective Work Contracts
EP No. |
Designated Project |
C1 |
C2 |
C3 |
C5A |
C5B |
C6 |
C7 |
|
Castle Peak Road Diversion |
ü |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
||
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement |
ü |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
||
Kwu Tung North New
Development Area Road D1 to D5 |
ü |
¡@ |
ü |
¡@ |
¡@ |
¡@ |
¡@ |
||
Sewage Pumping Stations in Kwu
Tung North New Development Area |
¡@ |
ü |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
||
Utilization of Treated Sewage Effluent (TSE) from
Shek Wu Hui Sewage Treatment Works |
ü |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
||
Fanling Bypass Eastern
Section |
¡@ |
¡@ |
ü |
ü |
ü |
¡@ |
¡@ |
||
Reprovision of temporary
Wholesale Market in Fanling North New Development
Area |
¡@ |
¡@ |
¡@ |
¡@ |
¡@ |
ü |
¡@ |
||
EP-546/2017 |
Fanling North Temporary
Sewage Pumping Station |
¡@ |
¡@ |
¡@ |
ü |
¡@ |
¡@ |
¡@ |
Note:
C1: ND/2019/01 C2:
ND/2019/02 C3: ND/2019/03 C5A: ND/2019/04
C5B: ND/2019/05 C6:
ND/2019/06 C7: ND/2019/07
2.4
The
site boundary of the Project and all Works Contracts are shown in Drawing No. 1.
2.5
The
required submissions and submission status under Environmental Permits are
shown in Appendix R.
2.6
Different
parties with different levels of involvement in the Project organization
include:
Project Proponent ¡V Civil
Engineering and Development Department (CEDD)
Supervisor
/ Supervisor's Representative ¡V AECOM
Environmental Team (ET) ¡V Wellab Limited
Independent Environmental Checker
(IEC) ¡V Mott MacDonald Hong Kong Ltd (MottMac)
2.7
The
key personnel contact names and numbers are summarised
in Table 2.2.
Table 2.2 Key Contacts of the Project
Party |
Role |
Contact Person |
Phone No. |
Fax
No. |
Civil Engineering and
Development Department, HKSAR (CEDD) |
Project Proponent |
Mr. Felix Fan |
3152 3551 |
3547
1658 |
Supervisor / Supervisor's Representative (AECOM) |
Chief Resident Engineer |
Mr. Alan Lee |
6398
5982 |
2645
3900 |
Environmental
Team (Wellab Limited) |
Environmental Team Leader |
Dr. Priscilla Choy |
2898
7388 |
2898 7076 |
Independent
Environmental Checker (MottMac) |
Independent
Environmental Checker |
Mr. Thomas Chan |
2828 5967 |
2827 1823 |
Contract No. ND/2019/01 Contractor
(Build King ¡V Richwell Engineering Joint Venture.) |
Site Agent |
Mr.
Ivan Leung |
9640 8340 |
-- |
Environmental Officer |
Mr. Edward
Tam |
9287 8270 |
||
Contract No. ND/2019/02 Contractor
(Chun Wo ¡V Kwan Lee Joint Venture.) |
Site Agent |
Mr. Luk Wai Lam |
3485 9780 |
-- |
Environmental Officer |
Mr. Ng
Tao, Richard |
9802 9577 |
||
Contract No. ND/2019/03 Contractor
(Sang Hing Kuly Joint
Venture) |
Site Agent |
Mr.
Tang Wing Kai |
9300 7037 |
-- |
Environmental Officer |
Mr.
Chow Ka Wing |
9184 6351 |
||
Environmental Supervisor |
Mr.
Ken Kwok |
9732 4360 |
||
Contract No. ND/2019/05 Contractor
(CRCC ¡V Paul Y. Joint Venture) |
Site Agent |
Mr.
Francis Suen |
6672 0311 |
-- |
Environmental Officer |
Mr.
Pan Fong |
9436 9435 |
||
Contract No. ND/2019/06 Contractor
(New Concepts Engineering Development Ltd.) |
Site Agent |
Mr.
Anson Chan |
9349 1320 |
2363 2162 |
Environmental Officer |
Mr.
Alex Choy |
9409 9608 |
||
Environmental Coordinator |
Ms.
Mildred Hung |
9460 2745 |
The major site activities undertaken
in the reporting month are shown in Table
2.3.
Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Contract No. |
Site Activities (January 2021) |
ND/2019/01 |
(a)
Site clearance
(tree felling) in Portion 1f (b)
Site
clearance, working platform erection for soil nail, soil nailing in Portion 2 (c)
Site
clearance in Portion 3 (d)
Erection of temporary noise barrier, laying of
rising mains in Portion 4 (e)
Site clearance,
temporary slope cutting for temporary soil nailing, Stockpile of soil, ground
investigation, construction of KW01 retaining wall in Portion 5 (f)
Site clearance,
temporary slope cutting for temporary soil nailing, sheetpiling
and excavation, pipes laying, backfilling, pre-bored H-piling, construction
of KW01 retaining wall, construction of site haul road in Portion 6a (g)
Arsenic
soil treatment works in Portion 6b (h)
Site
clearance, construction of temporary road for alternative Po Lau Road, construction
of site accommodation in Area T2 & T3, sheetpiling
and excavation, pipes laying in
Portion 7 (i)
Ground
Investigation, construction of retaining wall, slope cutting, soil nailing,
slope drainage and maintenance access construction, excavation for fresh
water service reservoir, RC construction of flushing water service reservoir
in Portion 8a (j)
Ground
Investigation (trial pits) in Portion 8b (k)
Site clearance. ground investigation, trial pits in Portion
9b (l)
Stockpile
of soil, temp. slope protection works in Portion 9c (m)
Pipes
laying, sheet piling for ELS and excavation works in Portion 10a (n)
Site clearance
in Portion 10b (o)
Site
clearance in Portion 16 |
ND/2019/02 |
(a)
GI (b)
Tree
felling (c)
ELS (d)
Hoarding
erection (e)
Pre-bored
Socked H-pile (f)
Footpath
improvement work |
ND/2019/03 |
(a)
Road
and Drainage work at Portion 1 (b)
Erection of Permanent Boundary Structure, Construction
of Irrigation Channel, Geotechnical Works in Long Valley (Trail Pits),
Construction of Temporary Road in Long Valley, Asbestos Removal in Long
Valley, Demolition of Existing Construction in Handed over Area, Construction
works of storage shed and Type 2 Storage House, Construction of Bird Hiad, Construction works of Outdoor
classroom, Wetland Creation & Restoration works after
Obtaining Approval from AFCD in Portion 2 to 20 (c)
Planting
in Portion 22 |
ND/2019/05 |
(a)
Ground investigation works, pre-drilling for
bored piles, bored piling, socketed H-pile installation and footing
construction for bridge foundation works (b)
Construction of utilities, drainage, car park and
miscellaneous and ABWF works for Project Manager¡¦s site accommodation (c)
Ground investigation works and SB permanent
footpath construction at Jockey Club Road (d)
Site formation and Utilities diversion works at
Tai Wo Service Road West (e)
Box culvert BC5 and associated drainage
construction and drainage works at Tai Wo Service Road East (f)
Erection of temporary signboard for dismantle
works of existing sign gantry E-DST11 |
ND/2019/06 |
(a)
Construction
of finishing works, E&M works and Building Services works of Management
Office Building (MOB) at Portion 4. (b)
Installation
of truss of steel canopy at Portion 3. (c)
Drainage
works in the final stage market at Portion 3. (d)
Formation
of carriageway and footway at Portion 3. (e)
Off-site
fabrication, welding and application of coating of steel truss of steel
canopy in China. (f)
Slope
improvement works at Portion 6. |
2.8
A
copy of Contractors¡¦ construction programme is
provided in Appendix A.
2.9
A
summary of the relevant permits, licences, and/or
notifications on environmental protection for this Project is presented in Table 2.4.
Table
2.4 Status of Environmental Licenses, Notifications and Permits
Contract No. |
Permit / License No. |
Valid Period |
Status |
|
From |
To |
|||
Environmental
Permit (EP) |
||||
ND/2019/01 |
EP-466/2013 |
21/11/2013 |
N/A |
Valid |
EP-467/2013/A |
27/01/2017 |
N/A |
Valid |
|
EP-468/2013/A |
27/01/2017 |
N/A |
Valid |
|
EP-470/2013 |
21/11/2013 |
N/A |
Valid |
|
ND/2019/02 |
EP-469/2013 |
21/11/2013 |
N/A |
Valid |
ND/2019/03 |
EP-468/2013/A |
27/01/2017 |
N/A |
Valid |
EP-473/2013/A |
21/11/2013 |
N/A |
Valid |
|
ND/2019/05 |
EP-473/2013/A |
21/11/2013 |
N/A |
Valid |
ND/2019/06 |
EP-475/2013/A |
13/01/2017 |
N/A |
Valid |
Construction Noise
Permit (CNP) |
||||
ND/2019/01 |
GW-RN0540-20 |
29/07/2020 |
16/01/2021 |
Expired
in the reporting period |
GW-RN0626-20 |
16/09/2020 |
15/03/2021 |
Valid |
|
GW-RN0625-20 |
08/09/2020 |
07/03/2021 |
Valid |
|
GW-RN0904-20 |
23/12/2020 |
22/03/2021 |
Valid |
|
GW-RN0011-21 |
17/01/2021 |
16/07/2021 |
Valid |
|
ND/2019/03 |
GW-RN0649-20 |
13/09/2020 |
28/02/2021 |
Valid |
ND/2019/05 |
GW-RN0578-20 |
11/08/2020 |
03/02/2021 |
Valid |
GW-RN0788-20 |
05/11/2020 |
04/05/2021 |
Valid |
|
GW-RN0890-20 |
21/12/2020 |
20/03/2021 |
Valid |
|
ND/2019/06 |
GW-RN0507-20 |
25/07/2020 |
24/01/2021 |
Expired
in the reporting period |
GW-RN0903-20 |
25/01/2021 |
24/07/2021 |
Valid |
|
Notification pursuant
to Air Pollution Control (Construction Dust)
Regulation |
||||
ND/2019/01 |
451792 |
11/12/2019 |
N/A |
Valid |
ND/2019/02 |
454012 |
05/03/2020 |
N/A |
Valid |
ND/2019/03 |
452216 |
24/12/2019 |
N/A |
Valid |
452332 |
31/12/2019 |
N/A |
Valid |
|
452333 |
31/12/2019 |
N/A |
Valid |
|
ND/2019/05 |
454323 |
13/03/2020 |
N/A |
Valid |
ND/2019/06 |
449369 |
24/09/2019 |
N/A |
Valid |
Billing Account for
Disposal of Construction Waste |
||||
ND/2019/01 |
7036265 |
17/01/2020 |
N/A |
Valid |
ND/2019/02 |
7036898 |
01/04/2020 |
N/A |
Valid |
ND/2019/03 |
7036378 |
22/01/2020 |
N/A |
Valid |
ND/2019/05 |
7036901 |
01/04/2020 |
N/A |
Valid |
ND/2019/06 |
7035473 |
17/10/2019 |
N/A |
Valid |
Registration
of Chemical Waste Producer |
||||
ND/2019/01 |
5213-545-B2578-01 |
10/01/2020 |
N/A |
Valid |
ND/2019/02 |
5213-548-C4439-01 |
06/05/2020 |
N/A |
Valid |
ND/2019/03 |
5213-623-S4231-01 |
14/04/2020 |
N/A |
Valid |
ND/2019/05 |
5213-625-C4464-01 |
20/05/2020 |
N/A |
Valid |
ND/2019/06 |
5213-625-N2716-01 |
02/10/2019 |
N/A |
Valid |
Effluent
Discharge License under Water Pollution Control Ordinance |
||||
ND/2019/01 |
WT00036071-2020 |
22/06/2020 |
30/06/2025 |
Valid |
WT00036073-2020 |
22/06/2020 |
30/06/2025 |
Valid |
|
WT00036067-2020 |
22/06/2020 |
30/06/2025 |
Valid |
|
WT00036076-2020 |
22/06/2020 |
30/06/2025 |
Valid |
|
WT00036075-2020 |
22/06/2020 |
30/06/2025 |
Valid |
|
ND/2019/02 |
WT00036584-2020 |
21/10/2020 |
31/10/2025 |
Valid |
WT00036952-2020 |
17/12/2020 |
31/12/2025 |
Valid |
|
ND/2019/03 |
WT00035847-2020 |
12/08/2020 |
31/08/2025 |
Valid |
ND/2019/05 |
WT00036996-2020 |
22/12/2020 |
31/12/2025 |
Valid |
ND/2019/06 |
WT00035415-2019 |
20/03/2020 |
31/03/2025 |
Valid |