11.1
Two Action
Level exceedance for construction noise monitoring were recorded due to the
documented noise complaint received for Contract ND/2019/02 and ND/2019/05 and
no exceedance of Limit Level for construction noise monitoring was recorded in
this reporting month.
11.2
No exceedance of Action and Limit Levels
of air quality, ambient arsenic, landfill gas monitoring and built heritage
monitoring in the reporting month. The summary of exceedance record in
reporting month is shown in Appendix L.
11.3
Ecological
monitoring was carried out in the Reporting Month. The Action and Limit Level
will be compared after the issue of Final Baseline Ecological Report.
11.4
Should the monitoring
results of the environmental monitoring parameters at any designated monitoring
stations indicate that the Action / Limit Levels are exceeded, the actions in
accordance with the Event and Action Plans in Appendix K would be carried out.
11.5
No
environmental non-compliance was recorded in the reporting month.
11.6
Four environmental
complaints was received in the reporting month. Two of the
complaint were received for ND/2019/01, one complaint was received for
ND/2019/02 and one complaint was received for ND/2019/05. The Cumulative Complaint Log since the
commencement of the Project is presented in Appendix P.
11.7
There was no successful
environmental prosecution or notification of summons received since the Project
commencement. The Cumulative Log for environmental summon and successful
prosecution since the commencement of the Project is presented in Appendix Q.