10.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are presented in Table 10.1 and Appendix M.
Table
10.1 Summary of Site Audit
Environmental Site Inspection |
Works Contracts |
||||
ND/2019/01 |
ND/2019/02 |
ND/2019/03 |
ND/2019/05 |
ND/2019/06 |
|
Weekly site audit with representative
of the Supervisor¡¦s Representative
and the Contractor |
5th , 12th, 19th,
26th January 2021 |
6th , 13th, 22nd,
27th January 2021 |
8th, 15th, 22nd,
29th January 2021 |
4th, 13th, 18th,
25th January 2021 |
6th, 11th, 21st,
28th January 2021 |
Joint Site Audit with representative
of the Supervisor¡¦s Representative,
the Contractor and IEC |
12th
January 2021 |
22nd January 2021 |
22nd January 2021 |
13th
January 2021 |
11th
January 2021 |
10.2
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised in Table 10.2.
Table 10.2
Observations and Recommendations during Site Audits |
|||
|
Date |
Observations and
Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||
Air Quality |
29/12/2020 |
To replace the impervious materials for covering
and sheltering stock of more than 20 bags of cement on top and 3 sides. (Portion
5) |
Improvement/Rectification was
observed during follow-up audit session on 5 January 2021. |
12/01/2021 |
NRMM Label was observed faded, Contractor was reminded to replace the
NRMM Label. |
Improvement/Rectification was
observed during follow-up audit session on 19 January 2021. |
|
26/01/2021 |
To avoid cement from extending beyond storage area for preventing
dust generation. (Portion 8) |
Follow-up action is needed to be
reported in the following month. |
|
Waste/ Chemical Management |
29/12/2020 |
Drip tray should be provided for chemical storage at Portion 8a. |
Improvement/Rectification was
observed during follow-up audit session on 5 January 2021. |
29/12/2020 |
To provide adequate capacity of storage area with drip trays for
chemical storage. (Portion 5) |
Improvement/Rectification was
observed during follow-up audit session on 5 January 2021. |
|
05/01/2021 |
Drip tray should be provided for chemical storage. |
Improvement/Rectification was
observed during follow-up audit session on 12 January 2021. |
|
19/01/2021 |
Drip tray should be provided for chemical storage. |
Improvement/Rectification was
observed during follow-up audit session on 26 January 2021. |
|
Contract
No.: ND/2019/02 |
|||
Air Quality |
06/01/2021 |
Contractor was reminded to water the exposed
worksites regularly to avoid dust generation. |
Improvement/Rectification
was observed during follow-up audit session on 13 January 2021. |
06/01/2021 |
NRMM Label was observed faded, Contractor was
reminded to replace the NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 13 January 2021. |
|
13/01/2021 |
NRMM Label was observed faded, Contractor was
reminded to replace the NRMM Label. |
Item
was remarked as 210122-R01. Follow-up action is needed to be reviewed. |
|
22/01/2021 |
NRMM Label was observed faded, Contractor was
reminded to replace the NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 27 January 2021. |
|
22/01/2021 |
Contractor was reminded to clean the road
regularly. |
Improvement/Rectification
was observed during follow-up audit session on 27 January 2021. |
|
Water Quality |
30/12/2020 |
Contractor was reminded to clear the debris in
channel. |
Item
was remarked as 210106-R03. Follow-up action is needed to be reviewed. |
06/01/2021 |
Contractor was reminded to clear the debris in
channel. |
Improvement/Rectification
was observed during follow-up audit session on 13 January 2021. |
|
22/01/2021 |
Contractor was reminded to provide sandbag to prevent surface runoff
and waste water discharge into nearby water course. |
Item
was remarked as 210127-R03. Follow-up action is needed to be reviewed. |
|
27/01/2021 |
To prevent surface muddy runoff from entering
nearby planting area. |
Follow-up
action is needed to be reported in the following month. |
|
Waste / Chemical Management |
22/01/2021 |
General refuse should be disposed of properly. |
Improvement/Rectification
was observed during follow-up audit session on 27 January 2021. |
22/01/2021 |
Properly clear the oil spillage from the
generator. |
Item
was remarked as 210127-R02. Follow-up action is needed to be reviewed. |
|
27/01/2021 |
To avoid overlapping of chemical and provide
adequate bund capacity for storage. |
Follow-up
action is needed to be reported in the following month. |
|
27/01/2021 |
Properly clear the oil stain from the air
compressor. |
Follow-up
action is needed to be reported in the following month. |
|
Ecology |
30/12/2020 |
Hoarding was erected at part of active works
area. Hoarding erection is still processing and will be checked and
reviewed. |
Improvement/Rectification
was observed during follow-up audit session on 6 January 2021. |
Contract No.: ND/2019/03 |
|||
Air Quality |
08/01/2021 |
Exposed worksite and haul road should be watered
at least once per hour to avoid dust generation. |
Improvement/Rectification
was observed during follow-up audit session on 15 January 2021. |
08/01/2021 |
NRMM Label was observed faded, Contractor was
reminded to replace the NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 15 January 2021. |
|
Waste/ Chemical Management |
08/01/2021 |
General refuse should be disposed of properly. |
Improvement/Rectification
was observed during follow-up audit session on 15 January 2021. |
15/01/2021 |
General refuse should be disposed of regularly. |
Improvement/Rectification
was observed during follow-up audit session on 22 January 2021. |
|
29/01/2021 |
Drip tray should be provided for chemical
storage. |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/05 |
|||
Air Quality |
28/12/2020 |
NRMM label was observed faded. Contractor was
reminded to display valid NRMM label. (Portion 6) |
Improvement/Rectification
was observed during follow-up audit session on 6 January 2021. |
28/12/2020 |
To keep public road near site entrance clean and
free of dust. |
Improvement/Rectification
was observed during follow-up audit session on 6 January 2021. |
|
04/01/2021 |
NRMM label should be displayed on regulated
machines. |
Improvement/Rectification
was observed during follow-up audit session on 13 January 2021. |
|
13/01/2021 |
NRMM label was observed faded. Contractor was
reminded to display valid NRMM label. |
Improvement/Rectification
was observed during follow-up audit session on 18 January 2021. |
|
Water Quality |
25/01/2021 |
Avoid any untreated wastewater/muddy water runoff into nearby
watercourse and site runoff should be directed to sedimentation tank before
discharging. |
Follow-up
action is needed to be reported in the following month. |
25/01/2021 |
Contractor was reminded to regularly monitor the sedimentation tank
to avoid overflow. |
Follow-up
action is needed to be reported in the following month. |
|
Waste / Chemical Management |
28/12/2020 |
To store chemical containers at area with drip
tray provided. (Portion 6) |
Improvement/Rectification
was observed during follow-up audit session on 6 January 2021. |
04/01/2021 |
The chemical waste container should be locked. |
Improvement/Rectification
was observed during follow-up audit session on 13 January 2021. |
|
18/01/2021 |
Drip tray should be provided for chemical
storage. |
Improvement/Rectification
was observed during follow-up audit session on 25 January 2021. |
|
Contract No.: ND/2019/06 |
|||
Air Quality |
11/01/2021 |
To further
enhance dust mitigation measure including watering for works area. |
Improvement/Rectification
was observed during follow-up audit session on 21 January 2021. |
Water Quality |
11/01/2021 |
Contractor
was reminded to clear the mud regularly and prevent/ avoid any muddy water
discharge into nearby watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 21 January 2021. |
Waste / Chemical Management |
06/01/2021 |
Housekeeping should be improved on site. |
Improvement/Rectification
was observed during follow-up audit session on 11 January 2021. |
Ecology |
11/01/2021 |
Dull green site barrier fences should be erected
around all active works areas. |
Improvement/Rectification
was observed during follow-up audit session on 21 January 2021. |
10.3
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
N. The photographic records of measures as stipulated in EP to mitigate
environmental impacts in the reporting month are presented in Table 10.3.
Table 10.3 Photographic Records and
Implementation Status of Measures
EP No. |
Condition |
Photographic
Record |
Implementation
Status |
EP-466/2013 |
2.9 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 10) |
^[1] |
EP-468/2013/A |
2.11 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 12) |
^[1] |
EP-469/2013 |
2.7 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 12) |
^[1] |
EP-473/2013/A |
2.13 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 14) |
^[1] |
EP-475/2013/A |
2.7 |
To minimise adverse
impacts on habitats of ecological importance in the vicinity of the Project,
2m high solid dull green site barrier fences shall be erected around all
active works areas.(Figure 15) |
^[1] |
Implementation
status: |
^ Mitigation
measure was fully implemented * Observation/reminder
was made during site audit but improved/rectified by the contractor # Observation/reminder
was made during site audit but not yet improved/ rectified by the contractor X Non-compliance
of mitigation measure ¡P Non-compliance
but rectified by the contractor N/A Not Applicable at this stage as no such
site activities were conducted in the reporting period |
[1]: Barrier
fences might be subjected to change according to phasing plan designed at
detailed design stage
10.4
Under
EP-467/2013/A (Condition 2.9), to minimise adverse
impacts on habitats of ecological importance in the vicinity of the Project, 2m
high solid dull green site barrier fences shall be erected around all active
works areas. As the Works programme under above EPs
were still under preparation work and the
barrier fences erection was still progressing in the Reporting Month, 2m high
solid dull green site barrier fences will be checked once in place. The
Hoarding Plan of the above EPs is shown in Figure
11.
10.5
Waste generated
from Contract No. ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/05 and ND/2019/06
include inert construction and demolition (C&D) materials and non-inert
C&D wastes in the Reporting Month.
10.6
The amount
of wastes generated by the construction works of the Contract No. ND/2019/01, ND/2019/02,
ND/2019/03, ND/2019/05 and ND/2019/06 during the
reporting month is shown in Appendix O.
10.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated EM&A Manual
and waste management plans shall be fully implemented. The status of
implementation of waste management and reduction measures are summited in Appendix N.