Table 4.5 Observation at Noise
Monitoring Stations
Contract
No. |
Monitoring Station |
Location |
Major Noise Source |
|
ND/2019/06 |
CP-FLN-NMS1[1] |
Belair
Monte (Existing) |
Excavator, Road
Traffic at Ma Sik Road, other construction site |
|
ND/2019/05 |
||||
CP-FLN-NMS2[2] |
Scattered Village House in Tong
Hang (Existing) |
Excavator, Breaking machine, Soil nailing
machine, Road Traffic near Tong Hang |
||
ND/2019/01 |
CP-KTN-NMS2[3] |
Residential Buildings at Ma Tso
Lung (Existing) |
Dump
truck, Road Traffic near Ma Tso Lung, Road washing |
|
ND/2019/01 |
CP-KTN-NMS3[4] |
Fung Kong Garden (Existing) |
Road Traffic near Fung Kong Garden |
|
ND/2019/01 |
CP-KTN-NMS5 |
N/A |
Traffic
noise from railway, other construction site |
|
ND/2019/02 |
CP-KTN-NMS6 |
Ho Sheung Heung, Hau Ku Shek Ancestral Hall, Hung Shing
Temple & Pai Fung Temple and Sin
Wai Nunnery (Existing) |
Road Traffic near Ho Sheung
Heung, other construction site |
Remarks:
[1]: Since the distance between monitoring station and site boundary of
ND/2019/03 under EP-473/2013/A exceeds 300m. The monitoring station is not
applicable to ND/2019/03.
[2]: Since the distance between monitoring station and site boundary of
ND/2019/03 under EP-473/2013/A exceeds 300m. The monitoring station is not
applicable to ND/2019/03.
[3],[4]: Since the distance between monitoring
station and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m. The
monitoring station is not applicable to ND/2019/03.