Table 10.2       Observations and Recommendations during Site Audits

 

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Air Quality

14/12/2021

Dusty stockpile should be covered by imperious sheeting.

 

                           

Improvement/Rectification was observed during follow-up audit session on 21 December 2021.

Ecology

14/12/2021

Solid dull green barrier should be enhanced along river channel.

Improvement/Rectification was observed during follow-up audit session on 21 December 2021.

Waste/ Chemical Management

28/12/2021

Drip tray should be provided for chemical storage.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/02

Air Quality

24/11/2021

NRMM Label was observed faded. Contractor was reminded to replace the NRMM Label.

Improvement/Rectification was observed during follow-up audit session on 1 December 2021.

8/12/2021

Replace faded NRMM label on generator. (North Bridge)

Item was remarked as 211217-R02. Follow-up action is needed to be reviewed.

17/12/2021

Replace faded NRMM label on generator. (North Bridge)

Improvement/Rectification was observed during follow-up audit session on 22 December 2021.

Water Quality

1/12/2021

Dusty slope surface should be covered. (North Bridge)

Improvement/Rectification was observed during follow-up audit session on 8 December 2021.

1/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Item was remarked as 211208-R01. Follow-up action is needed to be reviewed.

1/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Item was remarked as 211208-O04. Follow-up action is needed to be reviewed.

8/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Item was remarked as 211217-R01. Follow-up action is needed to be reviewed.

8/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Item was remarked as 211217-O03. Follow-up action is needed to be reviewed.

8/12/2021

To clear oil leakage from generator on site. (North Bridge)

Improvement/Rectification was observed during follow-up audit session on 17 December 2021.

17/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Item was remarked as 211222-R01. Follow-up action is needed to be reviewed.

17/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Item was remarked as 211222-O02. Follow-up action is needed to be reviewed.

22/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Item was remarked as 211229-R01. Follow-up action is needed to be reviewed.

22/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Item was remarked as 211222-O02. Follow-up action is needed to be reviewed.

22/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (North Bridge)

Item was remarked as 211222-O03. Follow-up action is needed to be reviewed.

29/12/2021

Remove dusty materials beside the U-channel and clear the stagnant water inside the U-channel. (South Bridge)

Follow-up action is needed to be reported in the following month.

29/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (河口)

Follow-up action is needed to be reported in the following month.

29/12/2021

To enhance water control measure to prevent any discharge of muddy water to Sheung Yue River. (North Bridge)

Follow-up action is needed to be reported in the following month.

29/12/2021

Clear and treat the stagnant muddy water inside the U-Channel with desilting facilities before discharge. (North Bridge)

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

3/12/2021

Dusty haul road should be sprayed with water regularly.

Improvement/Rectification was observed during follow-up audit session on 10 December 2021.

10/12/2021

Dusty stockpile should be covered by imperious sheeting.

Item was remarked as 211214-R02. Follow-up action is needed to be reviewed.

14/12/2021

Exposed worksite and haul road should be watered regularly.

Improvement/Rectification was observed during follow-up audit session on 24 December 2021.

14/12/2021

Excavated or stockpile of dusty materials should be covered by impervious sheeting or sprayed with water.

Improvement/Rectification was observed during follow-up audit session on 24 December 2021.

24/12/2021

Any portion of road leading to construction site within 30m of a vehicle exit should be kept free from dust and mud. Mud was observed along portion of road next to Sheung Yue River.

Improvement/Rectification was observed during follow-up audit session on 31 December 2021.

Water Quality

14/12/2021

To clean wheel-washing bay regularly.

Item was remarked as 211224-R01. Follow-up action is needed to be reviewed.

24/12/2021

To clean wheel-washing bay regularly.

Item was remarked as 211231-R01. Follow-up action is needed to be reviewed.

24/12/2021

To provide adequate wheel-washing bay facilities at every vehicle exit so as to prevent vehicles leaving site with earth mud.

Improvement/Rectification was observed during follow-up audit session on 31 December 2021.

31/12/2021

To clean wheel-washing bay regularly.

Follow-up action is needed to be reported in the following month.

Waste/ Chemical Management

23/11/2021

Empty chemical container should be stored properly in designated area.

Item was remarked as 211203-R02. Follow-up action is needed to be reviewed.

3/12/2021

Empty chemical container should be stored properly in designated area.

Improvement/Rectification was observed during follow-up audit session on 10 December 2021.

14/12/2021

Empty chemical containers should be stored at designated areas.

Improvement/Rectification was observed during follow-up audit session on 24 December 2021.

Contract No.: ND/2019/04

Air Quality

2/12/2021

Dusty stockpile should be covered by imperious sheeting.

Improvement/Rectification was observed during follow-up audit session on 10 December 2021.

Noise

 

2/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Item was remarked as 211210-R01. Follow-up action is needed to be reviewed.

 

10/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Item was remarked as 211216-R01. Follow-up action is needed to be reviewed.

 

16/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Item was remarked as 211223-R01. Follow-up action is needed to be reviewed.

 

23/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Item was remarked as 211230-R01. Follow-up action is needed to be reviewed.

 

30/12/2021

To enhance noise mitigation measures along Shek Wu San Tsuen.

Follow-up action is needed to be reported in the following month.

Ecology

2/12/2021

To provide 10m buffer zone along Siu Hang San Tsuen Stream.

Item was remarked as 211210-R02. Follow-up action is needed to be reviewed.

 

10/12/2021

To provide 10m buffer zone along Siu Hang San Tsuen Stream.

Item was remarked as 211216-R02. Follow-up action is needed to be reviewed.

 

16/12/2021

To provide 10m buffer zone along Siu Hang San Tsuen Stream.

Item was remarked as 211223-R02. Follow-up action is needed to be reviewed.

 

23/12/2021

To provide 10m buffer zone along Siu Hang San Tsuen Stream.

Improvement/Rectification was observed during follow-up audit session on 30 December 2021.

Water Quality

30/12/2021

To ensure sediment in U-channel was cleared regularly and avoid accumulation.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Air Quality

29/11/2021

Dusty stockpile should be covered by imperious sheeting.

Improvement/Rectification was observed during follow-up audit session on 8 December 2021.

8/12/2021

Faded NRMM label shall be replaced.

Improvement/Rectification was observed during follow-up audit session on 13 December 2021.

20/12/2021

Display valid NRMM label on regulated machine.

Improvement/Rectification was observed during follow-up audit session on 28 December 2021.

Water Quality

8/12/2021

Enhance mitigation measures to prevent surface runoff to Ma Wat River.

Improvement/Rectification was observed during follow-up audit session on 13 December 2021.

13/12/2021

Enhance mitigation measures to prevent surface runoff to Ma Wat River.

Improvement/Rectification was observed during follow-up audit session on 20 December 2021.

28/12/2021

Enhance mitigation measures to prevent surface runoff to Ma Wat River.

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

29/11/2021

Remove dusty materials beside the U-Channel and enhance mitigation measure to prevent muddy water runoff to the U-Channel.

Improvement/Rectification was observed during follow-up audit session on 8 December 2021.

20/12/2021

C&D materials should be segregated from other waste.

Improvement/Rectification was observed during follow-up audit session on 28 December 2021.

Contract No.: ND/2019/06

Waste / Chemical Management

2/12/2021

General refuse should be disposed of regularly to avoid accumulation.

Improvement/Rectification was observed during follow-up audit session on 9 December 2021.

Contract No.: ND/2019/07

 

--

--

--

--