Table 10.2 Observations and Recommendations during
Site Audits
|
Date |
Observations
and Recommendations |
Follow-up |
Contract No.: ND/2019/01 |
|||
Air Quality |
14/12/2021 |
Dusty stockpile should be covered by imperious
sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2021. |
Ecology |
14/12/2021 |
Solid dull green barrier should be enhanced along
river channel. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2021. |
Waste/ Chemical Management |
28/12/2021 |
Drip tray should be provided for chemical
storage. |
Follow-up
action is needed to be reported in the following month. |
Contract No.: ND/2019/02 |
|||
Air Quality |
24/11/2021 |
NRMM Label was observed faded. Contractor was reminded to replace the
NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 1 December 2021. |
8/12/2021 |
Replace faded NRMM label on generator. (North Bridge) |
Item
was remarked as 211217-R02. Follow-up action is needed to be reviewed. |
|
17/12/2021 |
Replace faded NRMM label on generator. (North Bridge) |
Improvement/Rectification
was observed during follow-up audit session on 22 December 2021. |
|
Water Quality |
1/12/2021 |
Dusty slope surface should be covered. (North Bridge) |
Improvement/Rectification
was observed during follow-up audit session on 8 December 2021. |
1/12/2021 |
Remove dusty materials beside the U-channel and clear the stagnant
water inside the U-channel. (South Bridge) |
Item
was remarked as 211208-R01. Follow-up action is needed to be reviewed. |
|
1/12/2021 |
To enhance water control measure to prevent any discharge of muddy
water to Sheung Yue River. (河口) |
Item
was remarked as 211208-O04. Follow-up action is needed to be reviewed. |
|
8/12/2021 |
Remove dusty materials beside the U-channel and clear the stagnant
water inside the U-channel. (South Bridge) |
Item
was remarked as 211217-R01. Follow-up action is needed to be reviewed. |
|
8/12/2021 |
To enhance water control measure to prevent any discharge of muddy
water to Sheung Yue River. (河口) |
Item
was remarked as 211217-O03. Follow-up action is needed to be reviewed. |
|
8/12/2021 |
To clear oil leakage from generator on site. (North Bridge) |
Improvement/Rectification
was observed during follow-up audit session on 17 December 2021. |
|
17/12/2021 |
Remove dusty materials beside the U-channel and clear the stagnant
water inside the U-channel. (South Bridge) |
Item
was remarked as 211222-R01. Follow-up action is needed to be reviewed. |
|
17/12/2021 |
To enhance water control measure to prevent any discharge of muddy
water to Sheung Yue River. (河口) |
Item
was remarked as 211222-O02. Follow-up action is needed to be reviewed. |
|
22/12/2021 |
Remove dusty materials beside the U-channel and clear the stagnant
water inside the U-channel. (South Bridge) |
Item
was remarked as 211229-R01. Follow-up action is needed to be reviewed. |
|
22/12/2021 |
To enhance water control measure to prevent any discharge of muddy
water to Sheung Yue River. (河口) |
Item
was remarked as 211222-O02. Follow-up action is needed to be reviewed. |
|
22/12/2021 |
To enhance water control measure to prevent any discharge of muddy water
to Sheung Yue River. (North Bridge) |
Item
was remarked as 211222-O03. Follow-up action is needed to be reviewed. |
|
29/12/2021 |
Remove dusty materials beside the U-channel and clear the stagnant
water inside the U-channel. (South Bridge) |
Follow-up
action is needed to be reported in the following month. |
|
29/12/2021 |
To enhance water control measure to prevent any discharge of muddy
water to Sheung Yue River. (河口) |
Follow-up
action is needed to be reported in the following month. |
|
29/12/2021 |
To enhance water control measure to prevent any discharge of muddy water
to Sheung Yue River. (North Bridge) |
Follow-up
action is needed to be reported in the following month. |
|
29/12/2021 |
Clear and treat the stagnant muddy water inside the U-Channel with
desilting facilities before discharge. (North Bridge) |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/03 |
|||
Air Quality |
3/12/2021 |
Dusty haul road should be sprayed with water
regularly. |
Improvement/Rectification
was observed during follow-up audit session on 10 December 2021. |
10/12/2021 |
Dusty stockpile should be covered by imperious sheeting. |
Item
was remarked as 211214-R02. Follow-up action is needed to be reviewed. |
|
14/12/2021 |
Exposed worksite and haul road should be watered regularly. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2021. |
|
14/12/2021 |
Excavated or stockpile of dusty materials should
be covered by impervious sheeting or sprayed with water. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2021. |
|
24/12/2021 |
Any portion of road leading to construction site
within 30m of a vehicle exit should be kept free from dust and mud. Mud was
observed along portion of road next to Sheung Yue River. |
Improvement/Rectification
was observed during follow-up audit session on 31 December 2021. |
|
Water Quality |
14/12/2021 |
To clean wheel-washing bay regularly. |
Item
was remarked as 211224-R01. Follow-up action is needed to be reviewed. |
24/12/2021 |
To clean wheel-washing bay regularly. |
Item
was remarked as 211231-R01. Follow-up action is needed to be reviewed. |
|
24/12/2021 |
To provide adequate wheel-washing bay facilities
at every vehicle exit so as to prevent vehicles leaving site with earth mud. |
Improvement/Rectification
was observed during follow-up audit session on 31 December 2021. |
|
31/12/2021 |
To clean wheel-washing bay regularly. |
Follow-up
action is needed to be reported in the following month. |
|
Waste/ Chemical Management |
23/11/2021 |
Empty chemical container should be stored
properly in designated area. |
Item
was remarked as 211203-R02. Follow-up action is needed to be reviewed. |
3/12/2021 |
Empty chemical container should be stored
properly in designated area. |
Improvement/Rectification
was observed during follow-up audit session on 10 December 2021. |
|
14/12/2021 |
Empty chemical containers should be stored at designated
areas. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2021. |
|
Contract No.: ND/2019/04 |
|||
Air Quality |
2/12/2021 |
Dusty stockpile should be covered by imperious sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 10 December 2021. |
Noise |
2/12/2021 |
To enhance noise mitigation measures along Shek
Wu San Tsuen. |
Item
was remarked as 211210-R01. Follow-up action is needed to be reviewed. |
|
10/12/2021 |
To enhance noise mitigation measures along Shek
Wu San Tsuen. |
Item
was remarked as 211216-R01. Follow-up action is needed to be reviewed. |
|
16/12/2021 |
To enhance noise mitigation measures along Shek
Wu San Tsuen. |
Item
was remarked as 211223-R01. Follow-up action is needed to be reviewed. |
|
23/12/2021 |
To enhance noise mitigation measures along Shek
Wu San Tsuen. |
Item
was remarked as 211230-R01. Follow-up action is needed to be reviewed. |
|
30/12/2021 |
To enhance noise mitigation measures along Shek
Wu San Tsuen. |
Follow-up
action is needed to be reported in the following month. |
Ecology |
2/12/2021 |
To provide 10m buffer zone along Siu Hang San
Tsuen Stream. |
Item
was remarked as 211210-R02. Follow-up action is needed to be reviewed. |
|
10/12/2021 |
To provide 10m buffer zone along Siu Hang San
Tsuen Stream. |
Item
was remarked as 211216-R02. Follow-up action is needed to be reviewed. |
|
16/12/2021 |
To provide 10m buffer zone along Siu Hang San
Tsuen Stream. |
Item
was remarked as 211223-R02. Follow-up action is needed to be reviewed. |
|
23/12/2021 |
To provide 10m buffer zone along Siu Hang San
Tsuen Stream. |
Improvement/Rectification
was observed during follow-up audit session on 30 December 2021. |
Water Quality |
30/12/2021 |
To ensure sediment in U-channel was cleared
regularly and avoid accumulation. |
Follow-up
action is needed to be reported in the following month. |
Contract No.: ND/2019/05 |
|||
Air Quality |
29/11/2021 |
Dusty stockpile should be covered by imperious
sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 8 December 2021. |
8/12/2021 |
Faded NRMM label shall be replaced. |
Improvement/Rectification
was observed during follow-up audit session on 13 December 2021. |
|
20/12/2021 |
Display valid NRMM label on regulated machine. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2021. |
|
Water Quality |
8/12/2021 |
Enhance mitigation measures to prevent surface
runoff to Ma Wat River. |
Improvement/Rectification
was observed during follow-up audit session on 13 December 2021. |
13/12/2021 |
Enhance mitigation measures to prevent surface
runoff to Ma Wat River. |
Improvement/Rectification
was observed during follow-up audit session on 20 December 2021. |
|
28/12/2021 |
Enhance mitigation measures to prevent surface
runoff to Ma Wat River. |
Follow-up
action is needed to be reported in the following month. |
|
Waste / Chemical Management |
29/11/2021 |
Remove dusty materials beside the U-Channel and
enhance mitigation measure to prevent muddy water runoff to the U-Channel. |
Improvement/Rectification
was observed during follow-up audit session on 8 December 2021. |
20/12/2021 |
C&D materials should be segregated from other
waste. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2021. |
|
Contract No.: ND/2019/06 |
|||
Waste / Chemical Management |
2/12/2021 |
General refuse should be disposed of regularly to
avoid accumulation. |
Improvement/Rectification
was observed during follow-up audit session on 9 December 2021. |
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |